A review of analytical models, approaches and decision support tools in project monitoring and control

Abstract This paper reviews the problems, approaches and analytical models on project control systems and discusses the possible research extensions. We focused on literature in Earned Value Analysis (EVA), optimization tools, and the design of decision support systems (DSS) that will contribute to helping project managers in planning and controlling under uncertain project environments. The review reveals that further research is essential to develop analytical models using EVA metrics to forecast project performance. It also suggests that DSS should be model driven, function as early warning systems and should be integrated to commercial project management software.

[1]  Matthew J. Liberatore,et al.  PROJECT MANAGEMENT IN CONSTRUCTION: SOFTWARE USE AND RESEARCH DIRECTIONS , 2001 .

[2]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[3]  Heinrich Kuhn,et al.  Designing decision support systems for value-based management: A survey and an architecture , 2012, Decis. Support Syst..

[4]  Kleanthis Sirakoulis,et al.  The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem , 2009 .

[5]  Avi Parush,et al.  Simulator-Based Team Training to Share Resources in a Matrix Structure Organization , 2010, IEEE Transactions on Engineering Management.

[6]  Vijay Kumar,et al.  Optimal allocation of testing effort during testing and debugging phases: a control theoretic approach , 2013, Int. J. Syst. Sci..

[7]  Prasanta Kumar Dey Decision support system for risk management: a case study , 2001 .

[8]  Willy Herroelen,et al.  Project Scheduling—Theory and Practice , 2005 .

[9]  Jan Węglarz,et al.  Project Scheduling with Continuously-Divisible, Doubly Constrained Resources , 1981 .

[10]  Eugeniusz Nowicki,et al.  Optimal control policies for resource allocation in an activity network , 1984 .

[11]  Mario Vanhoucke,et al.  On the dynamic use of project performance and schedule risk information during projecttracking , 2011 .

[12]  Nicholas G. Hall Project management: Recent developments and research opportunities , 2012 .

[13]  David L. Olson,et al.  Multi-Criteria Decision Support , 2008 .

[14]  Young Hoon Kwak,et al.  Exploring Monte Carlo Simulation Applications for Project Management , 2007 .

[15]  Quentin W. Fleming,et al.  Earned Value Project Management , 1996 .

[16]  Xiaoqing Frank Liu,et al.  An intelligent early warning system for software quality improvement and project management , 2006, J. Syst. Softw..

[17]  Urs Buehlmann,et al.  A spreadsheet-based decision support system for wood panel manufacturing , 2000, Decis. Support Syst..

[18]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[19]  Didier Gourc,et al.  Towards a multi-dimensional project Performance Measurement System , 2010, Decis. Support Syst..

[20]  F.T. Anbari,et al.  Earned Value Project Management Method and Extensions , 2003, IEEE Engineering Management Review.

[21]  Ofer Zwikael,et al.  The Effectiveness of Risk Management: An Analysis of Project Risk Planning Across Industries and Countries , 2011, Risk analysis : an official publication of the Society for Risk Analysis.

[22]  R. Alan Bowman Developing activity duration specification limits for effective project control , 2006, Eur. J. Oper. Res..

[23]  Ramesh Sharda,et al.  Model-driven decision support systems: Concepts and research directions , 2007, Decis. Support Syst..

[24]  A Gonik,et al.  On-line control model for network construction projects , 1997 .

[25]  Gad Vitner,et al.  Using data envelope analysis to compare project efficiency in a multi-project environment , 2006 .

[26]  Nachiappan Subramanian,et al.  A review of applications of Analytic Hierarchy Process in operations management , 2012 .

[27]  Luís Vladares Tavares,et al.  A review of the contribution of Operational Research to Project Management , 2002, Eur. J. Oper. Res..

[28]  Chih-Wei Chang,et al.  Monitoring the software development process using a short-run control chart , 2012, Software Quality Journal.

[29]  Klaus Werner Schmidt,et al.  An integrated scheduling and control model for multi-mode projects , 2013 .

[30]  Christopher A. Chung,et al.  A Statistical Project Control Tool for Engineering Managers , 2001 .

[31]  Konstantin Kogan,et al.  Optimal control in homogeneous projects: analytically solvable deterministic cases , 2002 .

[32]  Mario Vanhoucke An Overview of Recent Research Results and Future Research Avenues Using Simulation Studies in Project Management , 2013 .

[33]  Avraham Shtub,et al.  Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology , 2005, Ann. Oper. Res..

[34]  Mario Vanhoucke,et al.  A comparison of different project duration forecasting methods using earned value metrics , 2006 .

[35]  E. Kim,et al.  A survey of decision support system applications (1995–2001) , 2006, J. Oper. Res. Soc..

[36]  Mario Vanhoucke,et al.  Measuring Time: Improving Project Performance Using Earned Value Management , 2009 .

[37]  Homayoun Khamooshi,et al.  EDM: Earned Duration Management, a new approach to schedule performance management and measurement , 2014 .

[38]  Christer Carlsson,et al.  Past, present, and future of decision support technology , 2002, Decis. Support Syst..

[39]  Neil Hardie,et al.  The prediction and control of project duration: a recursive model , 2001 .

[40]  Mario Vanhoucke Measuring the efficiency of project control using fictitious and empirical project data , 2012 .

[41]  Ofer Zwikael,et al.  Prediction of project outcome The Application of statistical methods to earned value management and earned schedule performance indexes , 2009 .

[42]  Allan D. Chasey,et al.  Improving the cost and schedule control system , 1999 .

[43]  Rolf H. Möhring,et al.  Decision Support and Optimization in Shutdown and Turnaround Scheduling , 2011, INFORMS J. Comput..

[44]  F. T. Dweiri,et al.  Using fuzzy decision making for the evaluation of the project management internal efficiency , 2006, Decis. Support Syst..

[45]  Amir Salehipour,et al.  Evaluating fuzzy earned value indices and estimates by applying alpha cuts , 2011, Expert Syst. Appl..

[46]  Kuan Yew Wong,et al.  An efficient genetic algorithm for flexible job-shop scheduling problem , 2014, 2014 IEEE International Conference on Industrial Engineering and Engineering Management.

[47]  Öncü Hazir,et al.  Effects of the information presentation format on project control , 2011, J. Oper. Res. Soc..

[48]  Mooyoung Jung,et al.  Modeling and analysis of project performance factors in an extended project-oriented virtual organization (EProVO) , 2010, Expert Syst. Appl..

[49]  Denis F. Cioffi A tool for managing projects: an analytic parameterization of the S-curve , 2005 .

[50]  G. Thompson,et al.  Optimal Control Theory: Applications to Management Science and Economics , 2000 .

[51]  Didier Gourc,et al.  A decision-making tool to maximize chances of meeting project commitments , 2013 .

[52]  Jack R. Meredith,et al.  Project Management: A Managerial Approach , 1989 .

[53]  Jennifer A. Farris,et al.  Evaluating the Relative Performance of Engineering Design Projects: A Case Study Using Data Envelopment Analysis , 2006, IEEE Transactions on Engineering Management.

[54]  Raafat Elshaer,et al.  Impact of sensitivity information on the prediction of project's duration using earned schedule method , 2013 .

[55]  Jonathan Burton,et al.  Timing of monitoring and control of CPM projects , 1993 .

[56]  Willy Herroelen,et al.  A hierarchical approach to multi-project planning under uncertainty , 2004 .

[57]  Gad Vitner,et al.  Project Control: Literature Review , 2006 .

[58]  Amir Azaron,et al.  Time-cost trade-off via optimal control theory in Markov PERT networks , 2007, Ann. Oper. Res..

[59]  Kenneth R. Baker,et al.  PERT 21: Fitting PERT/CPM for use in the 21st century , 2012 .

[60]  José Manuel Galán,et al.  A new approach for project control under uncertainty. Going back to the basics , 2014 .

[61]  Gad Vitner,et al.  MPCS: Multidimensional Project Control System , 2004 .

[62]  Mario Vanhoucke,et al.  A simulation and evaluation of earned value metrics to forecast the project duration , 2005, J. Oper. Res. Soc..

[63]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[64]  Adolfo López-Paredes,et al.  Simulating the dynamic scheduling of project portfolios , 2010, Simul. Model. Pract. Theory.

[65]  Mario Vanhoucke,et al.  Using activity sensitivity and network topology information to monitor project time performance , 2010 .

[66]  Leila Moslemi Naeni,et al.  Monitoring project duration and cost in a construction project by applying statistical quality control charts , 2013 .

[67]  Chao Fang,et al.  A simulation-based risk network model for decision support in project risk management , 2012, Decis. Support Syst..

[68]  N. Trautmann,et al.  Resource-constrained scheduling of a real project from the construction industry: A comparison of software packages for project management , 2009, 2009 IEEE International Conference on Industrial Engineering and Engineering Management.

[69]  Roman Słowiński,et al.  DSS for multiobjective project scheduling , 1994 .

[70]  Avraham Shtub,et al.  Project Management: Processes, Methodologies, and Economics , 1994 .

[71]  Terry Williams Towards realism in network simulation , 1999 .

[72]  Alberto De Marco,et al.  An Earned Schedule-based regression model to improve cost estimate at completion , 2014 .

[73]  Terry Williams,et al.  The contribution of mathematical modelling to the practice of project management , 2003 .

[74]  Franco Caron,et al.  A Bayesian Approach to Improve Estimate at Completion in Earned Value Management , 2013 .

[75]  Tzvi Raz,et al.  Optimal timing of project control points , 2000, Eur. J. Oper. Res..

[76]  Avi Parush,et al.  Simulation‐based Learning in Engineering Education: Performance and Transfer in Learning Project Management , 2006 .

[77]  R. Macchiaroli,et al.  Timing of control activities in project planning , 1998 .

[78]  Ching-Chih Tseng Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics , 2011 .

[79]  Ozgur Turetken,et al.  A model-based DSS for integrating the impact of learning in project control , 2009, Decis. Support Syst..

[80]  Matthew J. Liberatore,et al.  Factors influencing the usage and selection of project management software , 2003, IEEE Trans. Engineering Management.

[81]  Reha Uzsoy,et al.  Executing production schedules in the face of uncertainties: A review and some future directions , 2005, Eur. J. Oper. Res..