A STUDY OF PROJECT PLANNING ON LIBYAN CONSTRUCTION PROJECTS

Construction projects are regularly faced by scheduling problems causing the projects to finish beyond their predetermined due date; this is a global phenomenon. The main purpose of this study is to consider the problems associated with project planning generally, with specific reference to construction projects in Libya. This study is unique in two respects. First, despite the recent high volume of infrastructure work in the country, there have been few investigations into construction delays in Libya. Secondly, earlier studies have considered the causes or the effects of project delays, whereas the present aim is to evaluate the potential of applying a planning and scheduling technique that is entirely novel in the Libyan context. The paper reports the results of Phase I of this research.

[1]  Dayana Bastos Costa,et al.  A Quantitative Analysis of the Implementation of the Last Planner System in Brazil , 2005 .

[2]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[3]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[4]  Clive Smallman,et al.  Managing project risks: a case study from the utilities sector , 2002 .

[5]  Roger Flanagan,et al.  Risk Management and Construction , 1993 .

[6]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[7]  Oldrich Stradal,et al.  Time Space Scheduling Method , 1982 .

[8]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[9]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[10]  Daniel W. Halpin,et al.  Design of construction and process operations , 1976 .

[11]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[12]  R. Yin Case Study Research: Design and Methods , 1984 .

[13]  David W. Johnston,et al.  Application of Linear Scheduling , 1986 .

[14]  Hal Macomber,et al.  Managing Promises with the Last Planner System: Closing in on Uninterrupted Flow , 2005 .

[15]  James Jerome O'Brien CPM In Construction Management , 1984 .

[16]  Davi Carmichael Project planning and control , 2006 .

[17]  Chul-Woo Lim,et al.  Implementing PPC in Korea’s Construction Industry , 2006 .

[18]  Antoine E. Naaman Networking Methods for Project Planning and Control , 1974 .

[19]  David Hillson,et al.  Extending the risk process to manage opportunities , 2002 .

[20]  Glenn Ballard,et al.  LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .

[21]  George S. Birrell Construction Planning—Beyond the Critical Path , 1980 .

[22]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[23]  Donncha Kavanagh Siren: a repetitive construction simulation model , 1985 .

[24]  David Greenwood,et al.  Implementing lean: UK culture and systems change , 2004 .

[25]  David Greenwood,et al.  A comparative analysis of administrative delays in hospital buildings , 2001 .

[26]  P. Thompson,et al.  Engineering Construction Risks - A Guide to Project Risk Analysis and Risk Management , 1994 .

[27]  Luis F. Alarcón,et al.  Learning From Collaborative Benchmarking in the Construction Industry , 2001 .