A Comparative Institutional Analysis of the Fukushima Nuclear Disaster: Lessons and Policy Implications

This paper analyzes the causes, responses, and consequences of the Fukushima nuclear power plant accident (March 2011) by comparing these with Three Mile Island (March 1979) and Chernobyl (April 1986). We identify three generic modes of organizational coordination: modular, vertical, and horizontal. By relying on comparative institutional analysis, we compare the modes' performance characteristics in terms of short-term and long-term coordination, preparedness for shocks, and responsiveness to shocks. We derive general lessons, including the identification of three shortcomings of integrated Japanese electric utilities: (1) decision instability that can lead to system failure after a large shock, (2) poor incentives to innovate, and (3) the lack of defense-in-depth strategies for accidents. Our suggested policy response is to introduce an independent Nuclear Safety Commission, and an Independent System Operator to coordinate buyers and sellers on publicly owned transmission grids. Without an independent safety regulator, or a very well established “safety culture,” profit-maximizing behavior by an entrenched electricity monopoly will not necessarily lead to a social optimum with regard to nuclear power plant safety. All countries considering continued operation or expansion of their nuclear power industries must strive to establish independent, competent, and respected safety regulators, or prepare for nuclear power plant accidents.

[1]  M. Aoki Corporations in Evolving Diversity: Cognition, Governance, and Institutions , 2010 .

[2]  Oliver Hart,et al.  Firms, contracts, and financial structure , 1995 .

[3]  M. Aoki Toward an Economic Model of the Japanese Firm , 2013 .

[4]  Geoffrey Rothwell,et al.  Electricity Economics: Regulation and Deregulation , 2003 .

[5]  長沢 信方 Report of the President's Commission on the Accident at Three Mile Island; The Need for Change; The Legacy of TMI, Washington, DC., 1979, Pergamon Press, New York and Oxford, (1979), ix+201ページ, 28×21.5cm, 4,650円. , 1980 .

[6]  M. Aoki The Five Phases of Economic Development and Institutional Evolution in China, Japan, and Korea , 2012 .

[7]  Kim B. Clark,et al.  The Option Value of Modularity in Design: An Example From Design Rules, Volume 1: The Power of Modularity , 2000 .

[8]  Frank A. Wolak,et al.  Designing Competitive Wholesale Electricity Markets for Latin American Countries , 2003 .

[9]  M. Aoki Horizontal vs. Vertical Information Structure of the Firm , 2013 .

[10]  Frank A. Wolak,et al.  Diagnosing the California Electricity Crisis , 2003 .

[11]  Geoffrey Rothwell,et al.  Organizational Structure and Expected Output at Nuclear Power Plants , 1996 .

[12]  Kim B. Clark,et al.  Design Rules: The Power of Modularity , 2000 .

[13]  B. Hobbs,et al.  When It Comes to Demand Response, Is FERC Its Own Worst Enemy? , 2009 .

[14]  G. Stigler The Theory of Economic Regulation , 2021, The Political Economy.

[15]  M. Aoki,et al.  Toward a Comparative Institutional Analysis , 2002 .

[16]  Masahiko Aoki,et al.  Information, Incentives, and Option Value: The Silicon Valley Model , 2002 .

[17]  S. Borenstein The Trouble With Electricity Markets: Understanding California's Restructuring Disaster , 2002 .

[18]  Kim B. Clark,et al.  Design Rules: The Power of Modularity Volume 1 , 1999 .