Risk management capability maturity model for complex product systems (CoPS) projects

Complex product systems (CoPS) are high cost, high technology, engineering intensive, business to business capital projects. The maturity of risk management capability can improve the production and performance of such projects. A risk management capability maturity model for CoPS projects (CoPS-RM-CMM) is proposed. The model is built on the standard five levels of capability maturity namely "initial", "repeatable", "defined", "managed", and "optimized. The model takes on a change management perspective addressing and analyzing issues in the organizational culture, risk management process and risk management knowledge, guided by strategic and performance measurement requirements. Case examples on CoPS project risk management such as those in the marine industry was used to illustrate the delineation and association of risk and capability maturity levels and the pertinent areas of capability.

[1]  M E Trudeau,et al.  Evaluating the quality of COPD care. , 1999, The American journal of nursing.

[2]  David Boddy,et al.  The expertise of the change agent: Public performance and backstage activity , 1992 .

[3]  Y. Kwak,et al.  Assessing Project Management Maturity , 2000 .

[4]  Brenda Whittaker,et al.  What went wrong? Unsuccessful information technology projects , 1999, Inf. Manag. Comput. Secur..

[5]  K. T. Yeo,et al.  Critical failure factors in information system projects , 2002 .

[6]  Jonathan Rosenhead,et al.  Soft Systems Methodology in Action , 1991 .

[7]  Eric B. Dent Complexity Science: A Worldview Shift , 1999 .

[8]  Michael Hobday,et al.  Technology management in complex product systems (CoPS) - ten questions answered , 1999 .

[9]  M. Uhl‐Bien,et al.  Leadership in complex organizations , 2001 .

[10]  Russ Marion,et al.  Organizational Extinction and Complex Systems , 1999 .

[11]  M. Hobday Product complexity, innovation and industrial organisation , 1998 .

[12]  Arkalgud Ramaprasad,et al.  Emergent project management: how foreign managers can leverage local knowledge , 2003 .

[13]  Michael T. Pich,et al.  Managing project uncertainty: from variation to chaos , 2002, IEEE Engineering Management Review.

[14]  E. Mitleton-Kelly Ten principles of complexity and enabling infrastructures , 2003 .

[15]  A. Shenhar,et al.  Risk Management, Project Success, and Technological Uncertainty , 2002 .

[16]  M. Porter How Competitive Forces Shape Strategy , 1989 .

[17]  John M. Longshore The Management of Strategic Change , 1990 .

[18]  M. Hobday The Project-Based Organisation: An ideal form for managing complex products and systems? , 2000 .

[19]  K. T. Yeo Strategy for risk management through problem framing in technology acquisition , 1995 .

[20]  M. Jelinek Managing change for competitive success , 1993 .

[21]  Mark C. Paulk,et al.  Extreme Programming from a CMM Perspective , 2001, IEEE Softw..

[22]  John C. Anderson,et al.  Maturity and its impact on new product development project performance , 2001 .

[23]  Roger Miller,et al.  Understanding and Managing Risks in Large Engineering Projects , 2001 .

[24]  Bela H. Banathy From evolutionary consciousness to guided evolution , 1993 .

[25]  Jesper Simonsen,et al.  Soft Systems Methodology , 2020, Systems Approaches to Making Change: A Practical Guide.

[26]  Harold Kerzner,et al.  Strategic Planning for Project Management Using a Project Management Maturity Model , 2001 .

[27]  Ofer Zwikael,et al.  Evaluating the quality of project planning: a model and field results , 2004 .

[28]  J. Kent Crawford Project Management Maturity Model: Providing a Proven Path to Project Management Excellence , 2001 .

[29]  Aaron J. Shenhar,et al.  From theory to practice: toward a typology of project-management styles , 1998 .

[30]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[31]  Audrey J. Dorofee,et al.  An Introduction to Team Risk Management , 1994 .

[32]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[33]  Isaac Cohen Philip Condit and the Boeing 777: from Design and Development to Production and Sales , 2003 .

[34]  Peter Checkland,et al.  Information, Systems, And Information Systems , 1997 .

[35]  Andrew Pettigrew,et al.  Shaping Strategic Change , 1992 .