An integrated inventory-targeting problem with time-dependent process mean

In this paper, the integrated inventory-targeting problem for a production process with time-dependent process mean is addressed. A lower specification limit is used to decide about the conformance of the finished product. The unit production cost is assumed to be a linear function of the amount of the single raw material used in producing the item. The formulated optimization model seeks to minimize the expected total cost which is composed of set-up cost, production cost, inventory holding cost, and raw material acquisition cost. The objective of this model is to simultaneously optimize the optimum process mean setting, raw material order quantity, and finished good production lot size. Due to the mathematical complexity of the objective function, the problem is approached heuristically by using an efficient search method.

[1]  William G. Hunter,et al.  Economic Selection of Quality Manufactured Product , 1984 .

[2]  Isaac N. Gibra Optimal production runs of processes subject to systematic trends , 1974 .

[3]  P. K. Banerjee,et al.  Selection of the Most Economical Production Plan in a Tool-Wear Process , 1985 .

[4]  Kwei Tang,et al.  Process Mean Determination with Quantity Discounts in Raw Material Cost , 1998 .

[5]  F. J. Arcelus,et al.  Optimal Production Run for a Normally Distributed Quality Characteristic Exhibiting Non-Negative Shifts in Process Mean and Variance , 1982 .

[6]  K. Al-Sultan,et al.  A tabu search Hooke and Jeeves algorithm for unconstrained optimization , 1997 .

[7]  Mohsen A. Jafari,et al.  The optimum target value for single filling operations with quality sampling plans , 1991 .

[8]  S. Eilon,et al.  Controlling Production Processes Which are Subject to Linear Trends , 1963 .

[9]  K. S. Al-Sultan,et al.  Variance reduction in a process with random linear drift , 1997 .

[10]  William G. Hunter,et al.  Determining the Most Profitable Target Value for a Production Process , 1977 .

[11]  K. S. Al-Sultan,et al.  An extension of Rahim and Banerjee's model for a process with upper and lower specification limits , 1997 .

[12]  Damodar Y. Golhar Determination of the Best Mean Contents for A "Canning Problem" , 1987 .

[13]  P. K. Banerjee,et al.  Optimal production run for a process with random linear drift , 1988 .

[14]  K. S. Al-Sultan,et al.  Determination of the optimal process means and production production cycles for multistage production systems subject to process deterioration , 1998 .

[15]  John L. Stanton,et al.  How Has the Quantity of the American Diet Changed During the Past Decade , 1981 .

[16]  Stephen M. Pollock,et al.  Determination of the Optimal Process Mean and the Upper Limit for a Canning Problem , 1988 .