Examination of communication processes in design-build project delivery in building construction
暂无分享,去创建一个
[1] Chang-Taek Hyun,et al. Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea , 2010 .
[2] Stephen Emmitt,et al. Communication in Construction Teams , 2006 .
[3] Ibrahim M. Mahdi,et al. Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .
[4] Ekambaram Palaneeswaran,et al. Contractor Selection for Design/Build Projects , 2000 .
[5] James T. O'Connor,et al. Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects , 2012 .
[6] Wang Hongdi,et al. Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China , 2013 .
[7] Albert P.C. Chan,et al. Determinants of Successful Design-Build Projects , 2008 .
[8] Min-Yuan Cheng,et al. Cross-organization process integration in design-build team , 2008 .
[9] R. A. Mohsini,et al. Determinants of performance in the traditional building process , 1992 .
[10] G. Edward Gibson,et al. Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .
[11] Keith R. Molenaar,et al. Practices for Developing Transparent Best Value Selection Procedures , 2015 .
[12] Edwin H.W. Chan,et al. Contract strategy for design management in the design and build system , 2005 .
[13] Douglas D. Gransberg,et al. Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .
[14] Luis F. Alarcón,et al. Selection of Third Party Relationships in Construction , 2014 .
[15] Alan Coday,et al. A conceptual framework of the interface between the design and construction processes , 2011 .
[16] Igal M. Shohet,et al. Communication Patterns in Construction at Construction Manager Level , 2003 .
[17] Keith R. Molenaar,et al. Exploring critical delivery selection risk factors for transportation design and construction projects , 2014 .
[18] C. William Ibbs,et al. Project delivery systems and project change: Quantitative analysis , 2003 .
[19] Petra M. Bosch-Sijtsema,et al. Managing projects with distributed and embedded knowledge through interactions , 2014 .
[20] Keith R. Molenaar,et al. Determining Optimal Proportion of Design in Design-Build Request for Proposals , 2013 .
[21] Keith R. Molenaar,et al. Determining the appropriate proportion of owner-provided design in design-build contracts - a content analysis approach , 2012 .
[22] Keith R. Molenaar,et al. DESIGN-BUILDER SELECTION FOR SMALL HIGHWAY PROJECTS , 2001 .
[23] Stephen R. Thomas,et al. Critical Communications Variables , 1998 .
[24] Roberto Pietroforte,et al. Communication and governance in the building process , 1997 .
[25] William Ibbs,et al. Design and construction coordination problems and planning for design–build project new users , 2010 .
[26] F. Ling,et al. Problems encountered by owners of design–build projects in Singapore , 2008 .
[27] Michael Coyle,et al. Critical Success Factors for Construction Projects , 1992 .
[28] Stephen Emmitt,et al. Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams , 2007 .