Examination of communication processes in design-build project delivery in building construction

Design-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity. There is limited research on how communication among parties influences the success of D-B projects. The purpose of this paper is to examine D-B communication issues and provides effective practices on communication to improve D-B procurement processes in the USA.,The research methodology for this study includes a comprehensive review of literature, survey questionnaire, and structured interviews. A questionnaire was developed to collect data from professionals with an average of 23 years of experience related to D-B procurement. Eight structured interviews were conducted to verify and validate the survey questionnaire results.,The results showed that the communication issues vary along with each phase of the D-B process. The primary communication practices influencing the success of D-B projects are: establishing clear points of contact; providing clear and understandable information among stakeholders during the D-B process; and the timely sharing of information to all stakeholders.,The chief limitation of this research is that the primary data were mostly opinions from experts although several empirical data were collected for cross-validation. This research did not consider the relationship of relevant contract clauses and communication issues.,The findings from this paper will help professionals better understand the D-B procurement process.,This is one of the first attempts to discuss D-B communication issues in each different phase of a D-B project.

[1]  Chang-Taek Hyun,et al.  Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea , 2010 .

[2]  Stephen Emmitt,et al.  Communication in Construction Teams , 2006 .

[3]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[4]  Ekambaram Palaneeswaran,et al.  Contractor Selection for Design/Build Projects , 2000 .

[5]  James T. O'Connor,et al.  Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects , 2012 .

[6]  Wang Hongdi,et al.  Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China , 2013 .

[7]  Albert P.C. Chan,et al.  Determinants of Successful Design-Build Projects , 2008 .

[8]  Min-Yuan Cheng,et al.  Cross-organization process integration in design-build team , 2008 .

[9]  R. A. Mohsini,et al.  Determinants of performance in the traditional building process , 1992 .

[10]  G. Edward Gibson,et al.  Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .

[11]  Keith R. Molenaar,et al.  Practices for Developing Transparent Best Value Selection Procedures , 2015 .

[12]  Edwin H.W. Chan,et al.  Contract strategy for design management in the design and build system , 2005 .

[13]  Douglas D. Gransberg,et al.  Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .

[14]  Luis F. Alarcón,et al.  Selection of Third Party Relationships in Construction , 2014 .

[15]  Alan Coday,et al.  A conceptual framework of the interface between the design and construction processes , 2011 .

[16]  Igal M. Shohet,et al.  Communication Patterns in Construction at Construction Manager Level , 2003 .

[17]  Keith R. Molenaar,et al.  Exploring critical delivery selection risk factors for transportation design and construction projects , 2014 .

[18]  C. William Ibbs,et al.  Project delivery systems and project change: Quantitative analysis , 2003 .

[19]  Petra M. Bosch-Sijtsema,et al.  Managing projects with distributed and embedded knowledge through interactions , 2014 .

[20]  Keith R. Molenaar,et al.  Determining Optimal Proportion of Design in Design-Build Request for Proposals , 2013 .

[21]  Keith R. Molenaar,et al.  Determining the appropriate proportion of owner-provided design in design-build contracts - a content analysis approach , 2012 .

[22]  Keith R. Molenaar,et al.  DESIGN-BUILDER SELECTION FOR SMALL HIGHWAY PROJECTS , 2001 .

[23]  Stephen R. Thomas,et al.  Critical Communications Variables , 1998 .

[24]  Roberto Pietroforte,et al.  Communication and governance in the building process , 1997 .

[25]  William Ibbs,et al.  Design and construction coordination problems and planning for design–build project new users , 2010 .

[26]  F. Ling,et al.  Problems encountered by owners of design–build projects in Singapore , 2008 .

[27]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[28]  Stephen Emmitt,et al.  Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams , 2007 .