Construction schedule optimization for high arch dams based on real-time interactive simulation

The construction process of high arch dams is extremely complicated. Therefore, optimization of the construction schedule is essential for construction management to save a large amount of time and investment costs. Construction simulation is an important tool for the construction schedule optimization of high arch dams. Most current studies involving construction schedule simulations do not concurrently consider real-time construction situations and site managers' requirements. In this paper, the real-time interactive simulation is proposed that could solve this problem. The real-time construction process is the initial condition of the simulation, and the actual construction parameters are the basis of the simulation parameters. Additionally, site managers can change the simulation strategy dynamically or enter requirements based on real-time construction situations. For a simulation result, different schemes are optimized with the entropy weight method. With this method, the construction simulation can track the rapid changes in construction situations and provide a reasonable construction schedule, which increases the flexibility of the construction simulation. The optimized construction scheme could be an effective guide for site construction. With a 4D (three dimensional model and time) CAD model, the simulation process can be well expressed. A case study shows that the construction schedule can be established in real time, and it's a useful tool for decision-making.

[1]  Alireza Ghaffari Hadigheh,et al.  Generalized support set invariancy sensitivity analysis in linear optimization , 2006 .

[2]  Mehmet Emre Bayraktar,et al.  Model for Analysis of Factors Affecting Construction Schedule in Highway Work Zones , 2006 .

[3]  Tien-Chin Wang,et al.  Developing a fuzzy TOPSIS approach based on subjective weights and objective weights , 2009, Expert Syst. Appl..

[4]  Julio C. Martinez,et al.  Visualizing Simulated Construction Operations in 3D , 2001 .

[5]  Lingguang Song,et al.  Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling , 2012 .

[6]  Simaan M. AbouRizk,et al.  Unified Modeling Methodology for Construction Simulation , 2002 .

[7]  Luh-Maan Chang,et al.  Simulation and analytical techniques for construction resource planning and scheduling , 2012 .

[8]  Yang Zhang,et al.  Design and Implementation of Loose-Coupling Visualization Components in a Distributed Construction Simulation Environment with HLA , 2012 .

[9]  Chung-Wei Feng,et al.  Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .

[10]  Al-HusseinMohamed,et al.  Post simulation visualization model for effective scheduling of modular building construction11This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management. , 2012 .

[11]  Andrew N. Baldwin,et al.  A virtual prototyping system for simulating construction processes , 2007 .

[12]  Vineet R. Kamat,et al.  Automated Generation of Operations Level Construction Animations in Outdoor Augmented Reality , 2009 .

[13]  Amlan Mukherjee,et al.  A multipurpose simulation platform for decision-making in construction management , 2010, Proceedings of the 2010 Winter Simulation Conference.

[14]  Vineet R. Kamat,et al.  BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps , 2015 .

[15]  G. Edward Gibson,et al.  Interactive simulation modeling for heavy construction operations , 2003 .

[16]  Lingguang Song,et al.  Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes , 2004 .

[17]  Simaan M. AbouRizk,et al.  Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction , 2011, Comput. Aided Civ. Infrastructure Eng..

[18]  Donncha Kavanagh Siren: a repetitive construction simulation model , 1985 .

[19]  Mohamed Al-Hussein,et al.  Post simulation visualization for effective scheduling of modular building construction , 2011 .

[20]  Symeon E. Christodoulou ANT COLONY OPTIMIZATION IN CONSTRUCTION SCHEDULING , 2005 .

[21]  Jonathan Jingsheng Shi,et al.  ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .

[22]  Mohamed Al-Hussein,et al.  Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management , 2012 .