Construction schedule optimization for high arch dams based on real-time interactive simulation
暂无分享,去创建一个
[1] Alireza Ghaffari Hadigheh,et al. Generalized support set invariancy sensitivity analysis in linear optimization , 2006 .
[2] Mehmet Emre Bayraktar,et al. Model for Analysis of Factors Affecting Construction Schedule in Highway Work Zones , 2006 .
[3] Tien-Chin Wang,et al. Developing a fuzzy TOPSIS approach based on subjective weights and objective weights , 2009, Expert Syst. Appl..
[4] Julio C. Martinez,et al. Visualizing Simulated Construction Operations in 3D , 2001 .
[5] Lingguang Song,et al. Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling , 2012 .
[6] Simaan M. AbouRizk,et al. Unified Modeling Methodology for Construction Simulation , 2002 .
[7] Luh-Maan Chang,et al. Simulation and analytical techniques for construction resource planning and scheduling , 2012 .
[8] Yang Zhang,et al. Design and Implementation of Loose-Coupling Visualization Components in a Distributed Construction Simulation Environment with HLA , 2012 .
[9] Chung-Wei Feng,et al. Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .
[10] Al-HusseinMohamed,et al. Post simulation visualization model for effective scheduling of modular building construction11This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management. , 2012 .
[11] Andrew N. Baldwin,et al. A virtual prototyping system for simulating construction processes , 2007 .
[12] Vineet R. Kamat,et al. Automated Generation of Operations Level Construction Animations in Outdoor Augmented Reality , 2009 .
[13] Amlan Mukherjee,et al. A multipurpose simulation platform for decision-making in construction management , 2010, Proceedings of the 2010 Winter Simulation Conference.
[14] Vineet R. Kamat,et al. BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps , 2015 .
[15] G. Edward Gibson,et al. Interactive simulation modeling for heavy construction operations , 2003 .
[16] Lingguang Song,et al. Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes , 2004 .
[17] Simaan M. AbouRizk,et al. Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction , 2011, Comput. Aided Civ. Infrastructure Eng..
[18] Donncha Kavanagh. Siren: a repetitive construction simulation model , 1985 .
[19] Mohamed Al-Hussein,et al. Post simulation visualization for effective scheduling of modular building construction , 2011 .
[20] Symeon E. Christodoulou. ANT COLONY OPTIMIZATION IN CONSTRUCTION SCHEDULING , 2005 .
[21] Jonathan Jingsheng Shi,et al. ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .
[22] Mohamed Al-Hussein,et al. Post simulation visualization model for effective scheduling of modular building construction, special issue on construction engineering and management , 2012 .