Preliminary analysis of possible 80 MW wind power plant "Vrataruša" connection to 110 kV transmission network" - study upgrade
暂无分享,去创建一个
The study presents analysis of WPP Vratarusa transmission grid connection with its installed capacity of 80 MW. Since absorbing capacity of existing network is not enough to accept 80 MW in all system states, there is a need to analyse adequate system reinforcement in order to fulfil power evacuation requirements.