Project Scheduling Problem Based on Modular Outsourcing
暂无分享,去创建一个
Guo-rong Chai | Yin-li Bao | Guo-xing Zhang | Ya-na Su | Guo-xing Zhang | G. Chai | Yana Su | yingling Bao
[1] Lars Bengtsson,et al. The integrator’s new advantage – The reassessment of outsourcing and production competence in a global telecom firm , 2008 .
[2] HE Zheng-wen. A Study on Multi-Mode Flexible-Resource-Constrained Project Scheduling with Discounted Cash Flow , 2005 .
[3] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[4] Jan Van Damme,et al. Project scheduling under uncertainty survey and research potentials , 2002 .
[5] Tyson R. Browning,et al. Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.
[6] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[7] Erik Demeulemeester,et al. Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..
[8] Tyson R. Browning,et al. Managing complex product development projects with design structure matrices and domain mapping matrices , 2007 .
[9] Kleanthis Sirakoulis,et al. The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem , 2009 .
[10] Wang Cheng-en,et al. A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution , 2009 .
[11] Yu Xu,et al. Simulated annealing and tabu search for multi-mode project payment scheduling , 2009, Eur. J. Oper. Res..