Visual Simulation - An Appropriate Approach to Support Execution Planning in Building Engineering

This paper focuses on a simulation concept to visualize and to analyze outfitting processes in building engineering. A constraint-based simulation model is used to specify dependencies between outfitting tasks, availability of resources and required work spaces. Further, the model is used to specify conditions of transport processes, delivery dates as well as time and cost restrictions. By using a constraint-based simulation model practicable schedules can be generated and visualized simultaneously. For example, execution conflicts such as restricted work spaces are highlighted. Afterwards, the simulated and visualized results can be evaluated in terms of work and material flow organization, utilization of space and worker’s efficiency. This constraint-based simulation approach guarantees a high flexibility. Thus, if additions or new prerequisites, for example, during project meetings are suggested, they could be easily implemented by defining or removing certain constraints such as requirements or production strategies. In the same manner, the current project status could be entered. Adjustable simulation components for transport control, spatial management, material management and assembling control as well as for visualization and animation are developed.

[1]  Toby Walsh,et al.  Handbook of Constraint Programming (Foundations of Artificial Intelligence) , 2006 .

[2]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .

[3]  Nashwan Dawood,et al.  Requirements identification for 4D constraintbased construction planning and control system , 2002 .

[4]  David R. Riley,et al.  Space Planning Method for Multistory Building Construction , 1997 .

[5]  J. Christopher Beck,et al.  This Is a Publication of The American Association for Artificial Intelligence , 2022 .

[6]  Jan Tulke,et al.  4D construction sequence planning – new process and data model , 2007 .

[7]  Gabriel A. Wainer,et al.  Representation and analysis of spatial resources in construction simulation , 2005, Proceedings of the Winter Simulation Conference, 2005..

[8]  Jürgen Sauer,et al.  A Multi-Site Scheduling System , 1998 .

[9]  Nashwan Dawood,et al.  Genetic algorithms for multi-constraint scheduling: an application for the construction industry , 2003 .

[10]  Burcu Akinci,et al.  Formalization and Automation of Time-Space Conflict Analysis , 2002 .

[11]  Toby Walsh,et al.  Handbook of Constraint Programming , 2006, Handbook of Constraint Programming.

[12]  Pascal Van Hentenryck,et al.  Strategic directions in constraint programming , 1996, CSUR.

[13]  Stephen F. Smith,et al.  ISIS—a knowledge‐based system for factory scheduling , 1984 .

[14]  Rina Dechter,et al.  Generalized best-first search strategies and the optimality of A* , 1985, JACM.

[15]  Hans-Joachim Goltz,et al.  Reducing Domains for Search in CLP(FD) and Its Application to Job-Shop Scheduling , 1995, CP.

[16]  Z. Mallasi Identification and Visualisation of Construction Activities’ Workspace Conflicts Utilising 4D CAD/VR Tools , 2004 .