A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production
暂无分享,去创建一个
Edgar Possani | Omar J. Ibarra-Rojas | Yasmín Á Ríos-Solís | Marta Cabo | M. Cabo | Edgar Possani | O. Ibarra-Rojas | Y. A. Rios-Solis
[1] Hartmut Stadtler,et al. Multi-level single machine lot-sizing and scheduling with zero lead times , 2011, Eur. J. Oper. Res..
[2] Yasmin A. Rios-Solis,et al. A decomposition approach for the piece–mold–machine manufacturing problem , 2011 .
[3] Jeng-Fung Chen,et al. Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints , 2006 .
[4] Hartmut Stadtler,et al. The Capacitated Lot-Sizing Problem with Linked Lot Sizes , 2003, Manag. Sci..
[5] Herbert Meyr,et al. Simultaneous lotsizing and scheduling on parallel machines , 2002, Eur. J. Oper. Res..
[6] C. K. Y. Lin,et al. Heuristic Approaches for a Scheduling Problem in the Plastic Molding Department of an Audio Company , 2002, J. Heuristics.
[7] Günter Fandel,et al. Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .
[8] Alf Kimms,et al. Lot sizing and scheduling -- Survey and extensions , 1997 .
[9] Geraldo Robson Mateus,et al. Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration , 2010, J. Sched..
[10] Diego Klabjan,et al. Modeling lotsizing and scheduling problems with sequence dependent setups , 2014, Eur. J. Oper. Res..
[11] Bernardo Almada-Lobo,et al. Synchronisation of scarce resources for a parallel machine lotsizing problem , 2011 .
[12] Rakesh Nagi,et al. Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs , 2005, Comput. Oper. Res..
[13] Ross J. W. James,et al. Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics , 2011, Comput. Oper. Res..
[14] Patrizia Beraldi,et al. Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..
[15] Youngho Lee,et al. Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum , 2010, Comput. Oper. Res..
[16] Herbert Meyr,et al. A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines , 2013, Eur. J. Oper. Res..
[17] Heinrich Kuhn,et al. Capacitated lot-sizing with extensions: a review , 2008, 4OR.
[18] Stéphane Dauzère-Pérès,et al. A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem , 2015, Eur. J. Oper. Res..
[19] John M. Wilson,et al. The capacitated lot sizing problem: a review of models and algorithms , 2003 .