Single machine scheduling with flow time and earliness penalties
暂无分享,去创建一个
[1] Marc E. Posner,et al. Minimizing Weighted Completion Times with Deadlines , 1985, Oper. Res..
[2] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[3] Suresh Chand,et al. Single machine scheduling to minimize weighted earliness subject to no tardy jobs , 1988 .
[4] T. Sen,et al. A branch-and-bound approach to the bicriterion scheduling problem invloving total flowtime and range of lateness , 1988 .
[5] Thomas L. Morin,et al. Branch-and-Bound Strategies for Dynamic Programming , 2015, Oper. Res..
[6] Chris N. Potts,et al. An algorithm for single machine sequencing with release dates to minimize total weighted completion time , 1983, Discret. Appl. Math..
[7] M. Held,et al. A dynamic programming approach to sequencing problems , 1962, ACM National Meeting.
[8] J. J. Kanet. Minimizing the average deviation of job completion times about a common due date , 1981 .
[9] Jonathan F. Bard,et al. Note-Operations Sequencing in Discrete Parts Manufacturing , 1989 .
[10] Timothy D. Fry,et al. A BI-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden , 1987, Comput. Oper. Res..
[11] L FoxBennett,et al. Shortest-Route Methods , 1979 .
[12] Jonathan F. Bard,et al. A GRASPTM for a difficult single machine scheduling problem, , 1991, Comput. Oper. Res..
[13] J. Erschler,et al. Applying new dominance concepts to job schedule optimization , 1982 .
[14] Averill M. Law,et al. The art and theory of dynamic programming , 1977 .
[15] Jwm Will Bertrand,et al. A comparison of due-date selection rules , 1981 .
[16] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[17] J. Wesley Barnes,et al. Scheduling Jobs with Linear Delay Penalties and Sequence Dependent Setup Costs , 1981, Oper. Res..
[18] S. Bansal. Single machine scheduling to minimize weighted sum of completion times with secondary criterion -- A branch and bound approach , 1980 .
[19] Chris N. Potts,et al. A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..
[20] Earl E. Bomberger,et al. A Dynamic Programming Approach to a Lot Size Scheduling Problem , 1966 .
[21] E. Denardo,et al. Shortest-Route Methods: 1. Reaching, Pruning, and Buckets , 1979, Oper. Res..
[22] Bruce Faaland,et al. Scheduling Tasks with Due Dates in a Fabrication/Assembly Process , 1987, Oper. Res..
[23] Uday S. Karmarkar,et al. Batching to minimize flow times on one machine , 1987 .
[24] Jerzy Kyparisis,et al. Single machine scheduling research , 1987 .
[25] R. A. Blau. N-Job, One Machine Sequencing Problems Under Uncertainty , 1973 .
[26] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints , 1971 .