The MESware scheduler: an adaptive production scheduling system with complex constraints
暂无分享,去创建一个
[1] Klaus Neumann,et al. Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling , 2001, OR Spectr..
[2] Patrick De Causmaecker,et al. Real-world production scheduling for the food industry: An integrated approach , 2012, Eng. Appl. Artif. Intell..
[3] Jürgen Kletti,et al. Manufacturing Execution Systems (MES) , 2007 .