A particle swarm-based genetic algorithm for scheduling in an agile environment
暂无分享,去创建一个
[1] Pius J. Egbelu,et al. Scheduling for machining and assembly in a job-shop environment , 1993 .
[2] Ling Wang,et al. An Effective Hybrid Heuristic for Flow Shop Scheduling , 2003 .
[3] Chilukuri K. Mohan,et al. Multi-phase Discrete Particle Swarm Optimization , 2002, JCIS.
[4] Andrew Kusiak,et al. Performance analysis of modular products , 1996 .
[5] Tony Owen. Assembly Automation And Product Design by Geoffrey Boothroyd Marcel Dekker, Inc., New York, 199, 413 pages including index ($114.50 or ca. £65.00) , 1992, Robotica.
[6] Guoyong Shi,et al. A genetic algorithm applied to a classic job-shop scheduling problem , 1997, Int. J. Syst. Sci..
[7] Colin R. Reeves,et al. A genetic algorithm for flowshop sequencing , 1995, Comput. Oper. Res..
[8] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[9] G. Boothroyd,et al. Assembly Automation and Product Design , 1991 .
[10] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .
[11] Ling Wang,et al. A Modified Genetic Algorithm for Job Shop Scheduling , 2002 .
[12] Chandrasekharan Rajendran,et al. Scheduling rules for dynamic shops that manufacture multi-level jobs , 2003 .
[13] Marie-Claude Portmann,et al. Branch and bound crossed with GA to solve hybrid flowshops , 1998, Eur. J. Oper. Res..
[14] Jose A. Ventura,et al. An application of genetic algorithms to lot-streaming flow shop scheduling , 2002 .
[15] Cihan H. Dagli,et al. A parallel genetic-neuro scheduler for job-shop scheduling problems , 1997 .
[16] Yeong-Dae Kim,et al. Simulated annealing and genetic algorithms for scheduling products with multi-level product structure , 1996, Comput. Oper. Res..
[17] GenMitsuo,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II , 1996 .
[18] Michel Gourgand,et al. Genetic algorithms applied to workshop problems , 1998, Int. J. Comput. Integr. Manuf..
[19] J. Kennedy,et al. Matching algorithms to problems: an experimental test of the particle swarm and some genetic algorithms on the multimodal problem generator , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).
[20] Takeshi Yamada,et al. Genetic Algorithms, Path Relinking, and the Flowshop Sequencing Problem , 1998, Evolutionary Computation.
[21] Jatinder N. D. Gupta,et al. Genetic algorithms for the two-stage bicriteria flowshop problem , 1996 .
[22] Masao Yokoyama,et al. Hybrid flow-shop scheduling with assembly operations , 2001 .
[23] Latif Al-Hakim,et al. An analogue genetic algorithm for solving job shop scheduling problems , 2001 .
[24] Xi Sun,et al. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling , 2003, Eur. J. Oper. Res..
[25] George L. Vairaktarakis,et al. Performance Comparison of Some Classes of Flexible Flow Shops and Job Shops , 1998 .
[26] Andrew Kusiak,et al. Scheduling manufacturing systems in an agile environment , 2001 .
[27] Adam Janiak,et al. Genetic algorithm for the permutation flow-shopscheduling problem with linear models of operations , 1998, Ann. Oper. Res..
[28] L. P. Khoo,et al. A Tabu-Enhanced Genetic Algorithm Approach to Agile Manufacturing , 2002 .
[29] Timothy D. Fry,et al. The effects of product structure and sequencing rule on assembly shop performance , 1989 .
[30] Chuen-Lung Chen,et al. An application of genetic algorithms for flow shop problems , 1995 .
[31] L. P. Khoo,et al. A Prototype Genetic Algorithm-Enhanced Multi-Objective Scheduler for Manufacturing Systems , 2000 .
[32] Geetha Srinivasan,et al. A genetic algorithm for job shop scheduling—a case study , 1996 .
[33] Ling Wang,et al. An effective hybrid optimization strategy for job-shop scheduling problems , 2001, Comput. Oper. Res..
[34] Robert L. Burdett,et al. Evolutionary algorithms for flowshop sequencing with non‐unique jobs , 2000 .
[35] Y. Rahmat-Samii,et al. Particle swarm, genetic algorithm, and their hybrids: optimization of a profiled corrugated horn antenna , 2002, IEEE Antennas and Propagation Society International Symposium (IEEE Cat. No.02CH37313).
[36] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[37] Pupong Pongcharoen,et al. Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products , 2002 .
[38] Andrew Kusiak. Aggregate scheduling of a flexible machining and assembly system , 1989, IEEE Trans. Robotics Autom..
[39] Haldun Aytug,et al. Use of genetic algorithms to solve production and operations management problems: A review , 2003 .
[40] David He,et al. Scheduling manufacturing systems for delayed product differentiation in agile manufacturing , 2002 .
[41] Riccardo Poli,et al. Particle swarm optimization , 1995, Swarm Intelligence.
[42] Russell C. Eberhart,et al. A discrete binary version of the particle swarm algorithm , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.