Research on autogeneration of Active-on-Arrow network chart in project management
暂无分享,去创建一个
[1] Jesus M. de la Garza,et al. Critical Path Method with Multiple Calendars , 2005 .
[2] Yang Bao-zhen. Algorithm Research of Network Auto Drawing and System Realization , 2004 .
[3] A new approach to drawing double code network diagram , 2005 .
[4] Siamak Haji Yakhchali,et al. Computing latest starting times of activities in interval-valued networks with minimal time lags , 2010, Eur. J. Oper. Res..
[5] Patricia D. Galloway. Comparative Study of University Courses on Critical-Path Method Scheduling , 2006 .
[6] Zeki Karaca,et al. The Application of Critical Path Method (CPM) in Workflow Schema of Marble Processing Plants , 2007 .
[7] Jesus M. de la Garza,et al. Evaluation of the Resource-Constrained Critical Path Method Algorithms , 2005 .
[8] Ming Lu,et al. Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization , 2008 .