The management of aging in nuclear power plant concrete structures
暂无分享,去创建一个
[1] Dan J Naus,et al. Primer on Durability of Nuclear Power Plant Reinforced Concrete Structures - A Review of Pertinent Factors , 2007 .
[2] Claus Grupen,et al. Nuclear Power Plants , 2010 .
[3] Bruce R. Ellingwood,et al. The Role of Fragility Assessment in Consequence-Based Engineering , 2005 .
[4] Bruce R. Ellingwood,et al. Report on aging of nuclear power plant reinforced concrete structures , 1996 .
[5] D. J. Naus,et al. An investigation of tendon sheathing filler migration into concrete , 1998 .
[6] Larry W. Masters,et al. Service life prediction , 1987 .
[7] Bruce R. Ellingwood,et al. Acceptable risk bases for design of structures , 2001 .
[8] Robert E. Melchers,et al. Modeling Complex Engineering Structures , 2007 .
[9] Patrick Anderson,et al. Reliability-based evaluation of the prestress level in concrete containments with unbonded tendons , 2008 .
[10] Asce,et al. Guideline for Structural Condition Assessment of Existing Buildings , 2000 .
[11] G. Bagchi,et al. Assessment of inservice conditions of safety-related nuclear plant structures , 1995 .