Optimum production and inspection modeling with minimal repair and rework considerations

Abstract This paper extends an integrated model of economic production quantity (EPQ) and preventive maintenance (PM) to incorporate possibilities of minimal repair and rework. Our model determines simultaneously the optimal number of inspections, the inspection interval, the EPQ, and the PM level. Numerical examples of Weibull shock models are given to show that allowing minimal repair and rework will raise the expected profit. Our analyses demonstrate that both minimal repair and rework significantly influence the optimal policy.

[1]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[2]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[3]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[4]  Mohammed Ben‐Daya,et al.  Effect of inspection errors and preventive maintenance on a two-stage production inventory system , 2007 .

[5]  Mohamed Ben-Daya,et al.  The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .

[6]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[7]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[8]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[9]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[10]  M. A. Rahim,et al.  Economic design of x -control charts under Weibull shock models , 1988 .

[11]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[12]  Mohamad Y. Jaber,et al.  Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups , 2006, Comput. Ind. Eng..

[13]  Simme Douwe P. Flapper,et al.  Logistic planning of rework with deteriorating work-in-process , 2004 .

[14]  M. A. Rahim JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .

[15]  C. T. Ng,et al.  Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables , 2007 .

[16]  M Ben-Daya,et al.  Integrated production and quality model under various preventive maintenance policies , 1998, J. Oper. Res. Soc..

[17]  Singa Wang Chiu,et al.  Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..

[18]  M. Ben-Daya Integrated production maintenance and quality model for imperfect processes , 1999 .

[19]  Sheng-Tsaing Tseng,et al.  Imperfect maintenance policies for deteriorating production systems , 1998 .

[20]  Douglas J. Thomas,et al.  The value of setup cost reduction and process improvement for the economic production quantity model with defects , 2006, Eur. J. Oper. Res..

[21]  Y.-C. Chen,et al.  Optimal inspection and economical production quantity strategy for an imperfect production process , 2006, Int. J. Syst. Sci..

[22]  T. Nakagawa A summary of imperfect preventive maintenance policies with minimal repair , 1980 .

[23]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[24]  Shey-Huei Sheu,et al.  Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..