Balancing of U-type assembly systems using simulated annealing
暂无分享,去创建一个
[1] David Sparling. Balancing Just-In-Time Production Units: The N U-Line Balancing Problem , 1998 .
[2] Thomas R. Hoffmann,et al. Assembly line balancing: a set of challenging problems , 1990 .
[3] Ihsan Sabuncuoglu,et al. Assembly line balancing using genetic algorithms , 2000, J. Intell. Manuf..
[4] Armin Scholl,et al. Balancing assembly lines effectively - A computational comparison , 1999, Eur. J. Oper. Res..
[5] Cecilia R. Aragon,et al. Optimization by Simulated Annealing: An Experimental Evaluation; Part II, Graph Coloring and Number Partitioning , 1991, Oper. Res..
[6] J. Wijngaard,et al. The U-line balancing problem , 1994 .
[7] John Miltenburg,et al. The mixed-model U-line balancing problem , 1998 .
[8] J. George Shanthikumar,et al. Bounds and approximations for cycle times of a U-shaped production line , 1997, Oper. Res. Lett..
[9] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[10] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[11] Subhash C. Sarin,et al. A survey of the assembly line balancing procedures , 1998 .
[12] S. Sahu,et al. Stochastic assembly line balancing using simulated annealing , 1994 .
[13] Timothy L. Urban,et al. Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .
[14] Cecilia R. Aragon,et al. Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning , 1989, Oper. Res..
[15] John Miltenburg,et al. The effect of breakdowns on U-shaped production lines , 2000 .
[16] Katsuhisa Ohno,et al. Stochastic analysis of a U-shaped production line with multiple workers , 1997 .
[17] John B. Kidd,et al. Toyota Production System , 1993 .
[18] John Miltenburg,et al. Balancing U-lines in a multiple U-line facility , 1998, Eur. J. Oper. Res..
[19] Katsuhisa Ohno,et al. An optimal worker allocation problem for a U-shaped production line , 1999 .
[20] Armin Scholl,et al. ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .
[21] E. H. Bowman. Assembly-Line Balancing by Linear Programming , 1960 .
[22] R. Kuik,et al. Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic , 1990 .
[23] Jan Karel Lenstra,et al. Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..
[24] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .