An optimisation model for scheduling the decommissioning of an offshore wind farm

An optimisation model is proposed for scheduling the decommissioning of an offshore wind farm in order to minimise the total cost which is comprised of jack-up vessel, barge (transfer) vessel, inventory, processing and on-land transportation costs. This paper also presents a comprehensive review of the strategic issues relating to the decommissioning process and of scheduling models that have been applied to offshore wind farms. A mathematical model using integer linear programming is developed to determine the optimal schedule considering several constraints such as the availability of vessels and planning delays. As the decommissioning problem is challenging to solve, a matheuristic approach based on the hybridisation of a heuristic approach and an exact method is also proposed to find near optimal solutions for a test set of problems. A set of computational experiments has been carried out to assess the proposed approach.

[1]  Liliane Pintelon,et al.  Prognostic maintenance scheduling for offshore wind turbine farms , 2012 .

[2]  Yu Ding,et al.  SIMULATION OF WIND FARM OPERATIONS AND MAINTENANCE , 2013 .

[3]  Achille Messac,et al.  Optimal Scheduling of Preventive Maintenance for Offshore Wind Farms , 2012 .

[4]  ByonEunshin,et al.  Simulation of wind farm operations and maintenance using discrete event system specification , 2011 .

[5]  Tahar Benmessaoud,et al.  Influence of Maintenance on the Performance of a Wind farm , 2013 .

[6]  V. Maniezzo,et al.  MATHEURISTICS: Hybridizing Metaheuristics and Mathematical Programming (Annals of Information Systems) , 2009 .

[7]  Yu Ding,et al.  Simulation of wind farm operations and maintenance using discrete event system specification , 2011 .

[8]  Lou Suhua A Unit Maintenance Scheduling Model Considering Peak Regulation Pressure Balance for Power System Containing Wind Farms , 2012 .

[9]  Chandra Ade Irawan,et al.  Bi-objective optimisation model for installation scheduling in offshore wind farms , 2017, Comput. Oper. Res..

[10]  Cássia Januário,et al.  Offshore Windfarm Decommissioning: A proposal for guidelines to be included in the European Maritime Policy , 2007 .

[11]  ABDERRAHIM AIT-ALLA,et al.  Aggregate Installation Planning of Offshore Wind Farms , 2013 .

[12]  Ghaith Rabadi,et al.  Exact and approximate methods for parallel multiple-area spatial scheduling with release times , 2013, OR Spectr..

[13]  Tasnim Ibn Faiz,et al.  Minimizing transportation and installation costs for turbines in offshore wind farms , 2017 .

[14]  Olga Guschinskaya,et al.  Matheuristics - Hybridizing Metaheuristics and Mathematical Programming , 2010, Matheuristics.

[15]  Evrim Ursavas,et al.  A benders decomposition approach for solving the offshore wind farm installation planning at the North Sea , 2017, Eur. J. Oper. Res..

[16]  Yu Ding,et al.  A stochastic DEVS wind turbine component model for wind farm simulation , 2010, SpringSim.

[17]  Michael Patriksson,et al.  A stochastic model for opportunistic maintenance planning of offshore wind farms , 2011, 2011 IEEE Trondheim PowerTech.

[18]  László Monostori,et al.  A system for the detailed scheduling of wind farm maintenance , 2011 .

[19]  Nils Boysen,et al.  Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal , 2018, OR Spectr..

[20]  Francis Quail,et al.  The Windy Domain - A Challenging Real-World Application of Integrated Planning and Scheduling , 2013, ICAPS.

[21]  Hamid Reza Karimi,et al.  Approach of a Port Inventory Control System For the Offshore Installation of Wind Turbines , 2012 .

[22]  Evangelos Boulougouris,et al.  A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations , 2018, Eur. J. Oper. Res..

[23]  Michael Lütjen,et al.  A milp for installation scheduling of offshore wind farms , 2011 .

[24]  Lina Bertling,et al.  An optimization framework for opportunistic maintenance of offshore wind power system , 2009, 2009 IEEE Bucharest PowerTech.

[25]  Kui Wang,et al.  Multi-time scales coordination scheduling of wind power integrated system , 2012, IEEE PES Innovative Smart Grid Technologies.

[26]  C. Guedes Soares,et al.  Maintenance Planning of an Offshore Wind Turbine Using Stochastic Petri Nets With Predicates , 2013 .

[27]  Magnus Stålhane,et al.  Routing and Scheduling of Maintenance Fleet for Offshore Wind Farms , 2015 .

[28]  Achille Messac,et al.  Optimal Preventive Maintenance Time Windows for Offshore Wind Farms Subject to Wake Losses , 2012 .

[29]  He Jian,et al.  Generator Maintenance Scheduling of Large-scale Wind Power Integration Considering Peak Shaving , 2012 .

[30]  Fatih Camci,et al.  European Journal of Operational Research Maintenance Scheduling of Geographically Distributed Assets with Prognostics Information , 2022 .

[31]  Nishesh Dharesh Parikh Optimizing maintenance cost of wind farms by scheduling preventive maintenance and replacement of critical components using mathematical approach , 2012 .

[32]  Mark J. Kaiser,et al.  Modeling the decommissioning cost of offshore wind development on the U.S. Outer Continental Shelf , 2012 .

[33]  Magnus Stålhane,et al.  Optimization of routing and scheduling of vessels to perform maintenance at offshore wind farms , 2015 .

[34]  Chandra Ade Irawan,et al.  Optimisation of maintenance routing and scheduling for offshore wind farms , 2017, Eur. J. Oper. Res..

[35]  Da Hai You,et al.  Long-Term Multi-Objective Optimization Dispatch and its Evaluation in Wind Integrated Power Systems , 2013 .