Optimization Design of Computer Monitoring and Control System for Hydropower Plants on Yalongjiang River

Based on the optimization design of the computer control system for hydropower plants on Yalongjiang river,this paper briefly discusses how to improve the reliability and stability of the computer control system.It focuses on the optimization design of the network configuration and structure,signal interference and lightning protection,power supply reliability,and software prevention.The successful experience is of reference value to the design and improvement of the computer control for giant hydropower plants.