Eliminating Design Alternatives under Interval-Based Uncertainty

[1]  Agma Information Sheet AMERICAN GEAR MANUFACTURERS ASSOCIATION Geometry Factors for Determining the Pitting Resistance and Bending Strength of Spur, Helical and Herringbone Gear Teeth , 1999 .

[2]  Durward K. Sobek,et al.  Involving suppliers in product development in the United States and Japan: evidence for set-based concurrent engineering , 1996 .

[3]  Walter L. Smith Probability and Statistics , 1959, Nature.

[4]  Alex M. Andrew Satisficing Games and Decision Making: With Applications to Engineering and Computer Science , 2005 .

[5]  Sheldon M. Ross,et al.  Introduction to probability models , 1975 .

[6]  H. Simon,et al.  Models of Bounded Rationality: Empirically Grounded Economic Reason , 1997 .

[7]  Kevin Forsberg,et al.  Visualizing Project Management , 1996 .

[8]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[9]  田口 玄一,et al.  System of experimental design : engineering methods to optimize quality and minimize costs , 1987 .

[10]  Stephen P. Boyd,et al.  Branch and bound algorithm for computing the minimum stability degree of parameter-dependent linear systems , 1991, International Journal of Robust and Nonlinear Control.

[11]  Christiaan J. J. Paredis,et al.  ON CHARACTERIZING AND ASSESSING THE VALIDITY OF BEHAVIORAL MODELS AND THEIR PREDICTIONS , 2004 .

[12]  de Weck,et al.  Isoperformance An Alternative Design Methodology for Engineering Systems , 2002 .

[13]  Georg Ch. Pflug,et al.  A branch and bound method for stochastic global optimization , 1998, Math. Program..

[14]  Efstratios Nikolaidis,et al.  Engineering Design Reliability Handbook , 2004 .

[15]  R. B. Kearfott,et al.  Applications of interval computations , 1996 .

[16]  George S. Fishman,et al.  Discrete-Event Simulation : Modeling, Programming, and Analysis , 2001 .

[17]  Robert L. Winkler,et al.  Uncertainty in probabilistic risk assessment , 1996 .

[18]  Allen C. Ward,et al.  Conceptual robustness in simultaneous engineering: A formulation in continuous spaces , 1995 .

[19]  Fred W. Glover,et al.  Future paths for integer programming and links to artificial intelligence , 1986, Comput. Oper. Res..

[20]  Roberto Montemanni,et al.  An algorithm for the relative robust shortest path problem with interval data , 2002 .

[21]  Lawrence. Davis,et al.  Handbook Of Genetic Algorithms , 1990 .

[22]  B. Hayes,et al.  A Lucid Interval , 2003, American Scientist.

[23]  S. Ferson,et al.  Different methods are needed to propagate ignorance and variability , 1996 .

[24]  David Schmeidleis SUBJECTIVE PROBABILITY AND EXPECTED UTILITY WITHOUT ADDITIVITY , 1989 .

[25]  Erik K. Antonsson,et al.  Imprecision in Engineering Design , 1995 .

[26]  Peter K. Newman Edgeworth and the development of neoclassical economics , 1989 .

[27]  Ramon E. Moore Methods and applications of interval analysis , 1979, SIAM studies in applied mathematics.

[28]  P. Walley Statistical Reasoning with Imprecise Probabilities , 1990 .

[29]  Herbert A. Simon,et al.  The Sciences of the Artificial , 1970 .

[30]  Farrokh Mistree,et al.  DECISION-BASED DESIGN - A CONTEMPORARY PARADIGM FOR SHIP DESIGN , 1990 .

[31]  Y. Ben-Haim Information-gap decision theory : decisions under severe uncertainty , 2001 .

[32]  Wei Chen,et al.  A CONCEPT EXPLORATION METHOD FOR DETERMINING ROBUST TOP-LEVEL SPECIFICATIONS , 1996 .

[33]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[34]  Ramon E. Moore Global optimization to prescribed accuracy , 1991 .

[35]  Crispin Hales,et al.  Engineering design: a systematic approach , 1989 .

[36]  Christiaan J. J. Paredis,et al.  The Value of Using Imprecise Probabilities in Engineering Design , 2006 .

[37]  R. Baker Kearfott Empirical Evaluation of Innovations in Interval Branch and Bound Algorithms for Nonlinear Systems , 1997, SIAM J. Sci. Comput..

[38]  Steven L. Cobb,et al.  International Economics , 1948, The Journal of Economic History.

[39]  Stacie Wu A Probabilistic Model of Set-Based Design , 1999 .

[40]  Kathleen V. Diegert,et al.  Error and uncertainty in modeling and simulation , 2002, Reliab. Eng. Syst. Saf..

[41]  Kevin Forsberg,et al.  The Relationship of Systems Engineering to the Project Cycle , 1992 .

[42]  Jens Clausen,et al.  Solving Large Quadratic Assignment Problems in Parallel , 1997, Comput. Optim. Appl..

[43]  E. L. Lawler,et al.  Branch-and-Bound Methods: A Survey , 1966, Oper. Res..

[44]  J. Neyman Outline of a Theory of Statistical Estimation Based on the Classical Theory of Probability , 1937 .

[45]  Evangelos Triantaphyllou,et al.  Multi-criteria Decision Making Methods: A Comparative Study , 2000 .

[46]  Farrokh Mistree,et al.  Metrics for Assessing Design Freedom and Information Certainty in the Early Stages of Design , 1998 .

[47]  George A. Hazelrigg,et al.  A Framework for Decision-Based Engineering Design , 1998 .

[48]  Per S. Laursen Simple Approches to Parallel Branch and Bound , 1993, Parallel Comput..

[49]  Søren Nielsen,et al.  Closure of "Interval Algebra to Deal with Pattern Loading and Structural Uncertainties" , 1995 .

[50]  G. Hazelrigg Systems Engineering: An Approach to Information-Based Design , 1996 .

[51]  Wolter J. Fabrycky,et al.  Decision evaluation with interval mathematics: a power distribution system case study , 1994 .

[52]  Wei Chen,et al.  An approach to decision-based design. , 2001 .

[53]  Farrokh Mistree,et al.  Utility-based decision support for selection in engineering design , 2001 .

[54]  Gareth W. Parry,et al.  The characterization of uncertainty in probabilistic risk assessments of complex systems , 1996 .

[55]  Isaac E. Elishakoff,et al.  Safety Factors and Reliability - Friends or Foes? , 2004 .

[56]  W. F. Riley,et al.  Statics and Mechanics of Materials: An Integrated Approach , 1996 .

[57]  Durward K. Sobek,et al.  Iteration in Engineering Design: Inherent and Unavoidable or Product of Choices Made? , 2003 .

[58]  William W. Finch,et al.  Predicate logic representations for design constraints on uncertainty supporting the set-based design paradigm , 1997 .

[59]  Steven C. Chapra,et al.  Numerical Methods for Engineers: With Programming and Software Applications , 1997 .

[60]  M. Fleischer,et al.  A Marketplace of Design Agents for Distributed Concurrent Set-Based Design 1 , 1997 .

[61]  Steven Vajda,et al.  Games and Decisions. By R. Duncan Luce and Howard Raiffa. Pp. xi, 509. 70s. 1957. (J Wiley & Sons) , 1959, The Mathematical Gazette.

[62]  J. Neyman,et al.  Frequentist probability and frequentist statistics , 1977, Synthese.

[63]  Ralph L. Keeney,et al.  Decisions with multiple objectives: preferences and value tradeoffs , 1976 .

[64]  Jens Clausen,et al.  On the best search strategy in parallel branch‐and‐bound:Best‐First Search versus Lazy Depth‐First Search , 1999, Ann. Oper. Res..

[65]  Ralph L. Keeney,et al.  Multiplicative Utility Functions , 1974, Oper. Res..

[66]  Wei Chen,et al.  An Approach to Decision-Based Design With Discrete Choice Analysis for Demand Modeling , 2003 .

[67]  Michael S. Eldred,et al.  Uncertainty Quantification In Large Computational Engineering Models , 2001 .

[68]  Ahmed E. Kamal,et al.  Dependable Handling of Uncertainty , 2003, Reliab. Comput..

[69]  A. F. Konar Methodology for Large-Scale Process Control System Design , 1987 .

[70]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[71]  Carolyn Conner Seepersad,et al.  The utility-based compromise decision support problem with applications in product platform design , 2001 .

[72]  F. J. Anscombe,et al.  A Definition of Subjective Probability , 1963 .

[73]  R. Steele Optimization , 2005 .

[74]  Robert L. Norton,et al.  Machine Design: An Integrated Approach , 1996 .

[76]  Roberto Montemanni,et al.  A branch and bound algorithm for the robust shortest path problem with interval data , 2004, Oper. Res. Lett..

[77]  Farrokh Mistree,et al.  A procedure for robust design: Minimizing variations caused by noise factors and control factors , 1996 .

[78]  C. Adjiman,et al.  A global optimization method, αBB, for general twice-differentiable constrained NLPs—II. Implementation and computational results , 1998 .

[79]  Eldon Hansen,et al.  Global optimization using interval analysis , 1992, Pure and applied mathematics.

[80]  Hande Yaman,et al.  The robust spanning tree problem with interval data , 2001, Oper. Res. Lett..

[81]  David Cebon,et al.  Materials Selection in Mechanical Design , 1992 .

[82]  M. Tribus Rational descriptions, decisions, and designs , 1969 .

[83]  J. Clausen,et al.  Branch and Bound Algorithms-Principles and Examples , 2003 .

[84]  William W. Finch,et al.  A SET-BASED SYSTEM FOR ELIMINATING INFEASIBLE DESIGNS IN ENGINEERING PROBLEMS DOMINATED BY UNCERTAINTY , 1997 .