COMMISSIONING EXPERIENCE OF SNS
暂无分享,去创建一个
[1] V. Danilov,et al. Performance of SNS Front end and warm linac , 2007, 2007 IEEE Particle Accelerator Conference (PAC).
[2] S. Henderson. COMMISSIONING AND INITIAL OPERATING EXPERIENCE WITH THE SNS 1 GEV LINAC , 2006 .
[3] V. Danilov,et al. ACCUMULATION OF HIGH INTENSITY BEAM AND FIRST OBSERVATIONS OF INSTABILITIES IN THE SNS ACCUMULATOR RING , 2006 .
[4] I.E. Campisi,et al. Testing of the SNS Superconducting Cavities and Cryomodules , 2005, Proceedings of the 2005 Particle Accelerator Conference.
[5] K. Thomsen,et al. Beam diagnostics at the high power proton beam lines and targets at PSI , 2005 .
[6] D. Jeon. Beam dynamics in the spallation neutron source linac , 2003, Proceedings of the 2003 Particle Accelerator Conference.
[7] F. Gerigk,et al. ISIS megawatt upgrade plans , 2003, Proceedings of the 2003 Particle Accelerator Conference.
[8] T. Spickermann,et al. Status of the experimental studies of the electron cloud at the Los Alamos proton storage ring , 2003, Proceedings of the 2003 Particle Accelerator Conference.
[9] Jie Wei. Spallation Neutron Source ring status, challenges, issues, and perspectives , 2003, Proceedings of the 2003 Particle Accelerator Conference.