A proactive plan-do-check-act approach to defect management based on a Swedish construction project

In order to continuously improve quality and avoid reoccurrence of defects, defect management (DM) in construction needs to take a more proactive approach. The classification of construction information is important for the efficient exchange and integration of data between the many roles and phases of construction and facility management, but it also provides a framework for standardization, which in turn is paramount for improvement. In order to better understand how defects can be managed proactively we conducted a case study on inspection practices at a large construction project in Sweden, using observation and analysis of inspection reports. We identified opportunities and obstacles in the classification of defect data. The project’s defect descriptions were often ambiguous and the records lacked important contextual information. We believe that this was because current practice is not designed with proactivity in mind, and there are only regulatory requirements on the data, making classification difficult. In addition, by viewing the project’s practices through the lenses of continuous improvement and plan-do-check-act theory to identify missing or inadequate steps, we propose a framework for a proactive version of the current defect management process that could potentially help to prioritize improvement work and reduce the incidence of defects.

[1]  Vince Thomson,et al.  A review of research on cost of quality models and best practices , 2006 .

[2]  Oh-Seong Kwon,et al.  A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template , 2013 .

[3]  Denis A. Chamberlain,et al.  Building inspection: can computer vision help? , 1997 .

[4]  Yehiel Rosenfeld,et al.  Cost of quality versus cost of non‐quality in construction: the crucial balance , 2009 .

[5]  Abdul Samad Kazi,et al.  KNOWLEDGE MANAGEMENT FOR THE CONSTRUCTION INDUSTRY: THE E-COGNOS PROJECT , 2002 .

[6]  Yong K. Cho,et al.  A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects , 2008 .

[7]  L. J. Porter,et al.  Quality costing for total quality management , 1992 .

[8]  Charles H. Fine Quality Improvement and Learning in Productive Systems , 1986 .

[9]  Bernard Kamsu-Foguem,et al.  Continuous improvement through knowledge-guided analysis in experience feedback , 2011, Eng. Appl. Artif. Intell..

[10]  Subashini Suresh,et al.  PROJECT DEBRIEFING: A MULTI-DOMAIN REVIEW OF PRACTICES AND PROCEDURES , 2008 .

[11]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[12]  José L. Perdomo,et al.  Construction field data inspection using pocket PC technology , 2002 .

[13]  Robert Lundkvist,et al.  Digitalization of inspection data : a means for enhancing learning and continuous improvements? , 2010 .

[14]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .

[15]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[16]  Tamer E. El-Diraby,et al.  Distributed Ontology Architecture for Knowledge Management in Highway Construction , 2005 .

[17]  Robert Lundkvist,et al.  REQUIREMENTS OF AN INTER-PROJECT DIGITAL INSPECTION SYSTEM , 2010 .

[18]  James Sommerville,et al.  Defects and rework in new build: an analysis of the phenomenon and drivers , 2007 .

[19]  C. Brodsky The Discovery of Grounded Theory: Strategies for Qualitative Research , 1968 .

[20]  Nilson Arrais Quality control handbook , 1966 .

[21]  Zahir Irani,et al.  A project management quality cost information system for the construction industry , 2003, Inf. Manag..

[22]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[23]  J. L. Ashford,et al.  The Management of Quality in Construction , 2002 .

[24]  John Meiling,et al.  A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding , 2014 .

[25]  W. Edwards Deming,et al.  The New Economics for Industry, Government, Education , 2018 .

[26]  Andrea Chiarini,et al.  Japanese total quality control, TQM, Deming's system of profound knowledge, BPR, Lean and Six Sigma: Comparison and discussion , 2011 .

[27]  M Williams,et al.  Managing Quality , 2018 .

[28]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[29]  John Meiling,et al.  Defects in offsite construction: timber module prefabrication , 2009 .

[30]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[31]  S. Thomas Foster An examination of the relationship between conformance and quality‐related costs , 1996 .

[32]  A. Sohal,et al.  Capturing rework costs in projects , 2003 .

[33]  Peter E.D. Love,et al.  Auditing the indirect consequences of rework in construction: a case based approach , 2002 .

[34]  Kathleen M. Eisenhardt,et al.  Theory Building From Cases: Opportunities And Challenges , 2007 .

[35]  A. Darker,et al.  TOTAL QUALITY CONTROL , 1987 .

[36]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[37]  Anders Ekholm A Conceptual Framework for Classification of Construction Works , 1996, J. Inf. Technol. Constr..

[38]  P. B. Petersen The New Economics for Industry, Government, Education , 1993 .

[39]  Per-Erik Josephson,et al.  Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry , 2002 .

[40]  Barrie Dale,et al.  The Management of Quality:: A Top Management View , 1984 .

[41]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[42]  Mi Jeong Kim,et al.  Construction defect management using a telematic digital workbench , 2009 .

[43]  Burcu Akinci,et al.  Formalism for Construction Inspection Planning: Requirements and Process Concept , 2007 .

[44]  A. Ansari,et al.  Two New Dimensions in the Cost of Quality , 1987 .

[45]  E. Ziegel Juran's Quality Control Handbook , 1988 .

[46]  Graham Winch,et al.  Managing Construction Projects , 2009 .

[47]  M. Beruvides,et al.  Using Opportunity Costs to Determine the Cost of Quality: A Case Study in a Continuous-Process Industry , 1998 .

[48]  C. Tomkins,et al.  Quality failure costs in civil engineering projects , 2000 .

[49]  Thomas F. Burgess,et al.  Modelling quality‐cost dynamics , 1996 .

[50]  John Meiling,et al.  Feedback in industrialised housing, why does it not happen? , 2008 .