Installation of Shimming Bars for CYCIAE-100
暂无分享,去创建一个
The 100 MeV high intensity proton cyclotron, CYCIAE-100, is the most critical equipment of the BRIF project at CIAE. The shimming bars are used to get the isochronous magnetic field. In the process of magnetic mapping and shimming, the bars should be repeated the installed and disassembly for about 10 times. Each time the installation precision must be ensured. The bars installation schedule and quality are directly related to the BRIF project progress.