Capital project planning for a circular economy

Abstract Achieving true sustainability in the conceptualization of new building projects requires radical change compared to traditional green-field projects; circular building principles in a circular economy must become a fundamental part of the process. These principles include product recovery management, life cycle assessment (LCA), design for disassembly sequence planning, adaptability, deconstruction, closed materials loops and dematerialization. These principles recognize the importance of the End-of-Life stage in existing buildings, including adaptive reuse as an attractive alternative in a circular economy. However, the early phases of capital project delivery lack well-developed methods to: (1) decide amongst green-field construction versus adaptive reuse, (2) pre-project planning for closed-loop cycle construction and (3) plan for the optimization of the benefits of adaptive reuse. In this article, we argue that the early capital projects delivery phases for a circular economy should have distinct stages, decision gates and more appropriate planning methods, such as selective disassembly, LCA monetization protocols and optimization methods. An investigation of related studies underpins the capital project planning framework proposed and the research that must still be accomplished to enable a more circular economy in the capital projects sector.

[1]  Jamie Yeung,et al.  Development of Analysis Tools for the Facilitation of Increased Structural Steel Reuse , 2016 .

[2]  Peter W. G. Morris,et al.  Exploring the front-end of project management , 2013 .

[3]  Paola Sassi,et al.  Defining closed-loop material cycle construction , 2008 .

[4]  Chi Sun Poon,et al.  Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong , 2014 .

[5]  Purdue Ect Team,et al.  Lean Project Delivery System , 2007 .

[6]  Shahin Mokhlesian,et al.  Business model changes and green construction processes , 2012 .

[7]  O. Edenhofer,et al.  Mitigation from a cross-sectoral perspective , 2007 .

[8]  Mark Gorgolewski,et al.  The implications of reuse and recycling for the design of steel buildings , 2006 .

[9]  Craig Langston,et al.  The role of coordinate-based decision-making in the evaluation of sustainable built environments , 2013 .

[10]  José Dinis Silvestre,et al.  Environmental impacts and benefits of the end-of-life of building materials – calculation rules, results and contribution to a “cradle to cradle” life cycle , 2014 .

[11]  Magdalena Svanström,et al.  Life cycle assessment of construction materials: the influence of assumptions in end-of-life modelling , 2014, The International Journal of Life Cycle Assessment.

[12]  G. Edward Gibson,et al.  Development of a Project Definition Rating Index (PDRI) for General Building Projects , 2000 .

[13]  N. Nakicenovic,et al.  Climate change 2007: Mitigation. Contribution of Working Group III to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. Summary for Policymakers. , 2007 .

[14]  Sheila Conejos,et al.  Enhancing sustainability through designing for adaptive reuse from the outset: A comparison of adaptstar and adaptive reuse potential (ARP) models , 2015 .

[15]  P. Lacy,et al.  Waste to Wealth: The Circular Economy Advantage , 2015 .

[16]  Yongtao Tan,et al.  A fuzzy approach for adaptive reuse selection of industrial buildings in Hong Kong , 2014 .

[17]  Heidi Merrild,et al.  Building a Circular Future , 2016 .

[18]  George Ofori,et al.  Sustainable construction: principles and a framework for attainment - comment , 1998 .

[19]  André Stephan,et al.  Quantifying and mapping embodied environmental requirements of urban building stocks , 2017 .

[20]  Martin Loosemore,et al.  A theory of waste behaviour in the construction industry , 2001 .

[21]  Frank Schultmann,et al.  Energy-oriented deconstruction and recovery planning , 2007 .

[22]  Peter W. G. Morris,et al.  Managing the Front-End: Back to the beginning , 2011 .

[23]  Regine Ortlepp,et al.  Material stocks in Germany's non-domestic buildings: a new quantification method , 2016 .

[24]  Drew T. Shindell,et al.  The social cost of atmospheric release , 2015, Climatic Change.

[25]  David E. Shiers,et al.  Sustainable construction: the development and evaluation of an environmental profiling system for construction products , 2006 .

[26]  Pwg Morris,et al.  Project Initiation: Managing the Front End , 2013 .

[27]  Veronica Soebarto,et al.  Smart steel: new paradigms for the reuse of steel enabled by digital tracking and modelling , 2015 .

[28]  E. Hultink,et al.  The Circular Economy - A New Sustainability Paradigm? , 2017 .

[29]  Evan Bingham,et al.  Infrastructure Project Scope Definition Using Project Definition Rating Index , 2017 .

[30]  W. Stahel The circular economy , 2016, Nature.

[31]  Other Buildings and Climate Change: Status, Challenges and opportunities , 2007 .

[32]  Nicola Costantino The contribution of Ranko Bon to the debate on sustainable construction , 2006 .

[33]  Sophie Francesca Cantell The Adaptive Reuse of Historic Industrial Buildings: Regulation Barriers, Best Practices and Case Studies , 2005 .

[34]  Sara Wilkinson,et al.  Using building adaptation to deliver sustainability in Australia , 2009 .

[35]  W. Viscusi,et al.  Monetizing the Benefits of Risk and Environmental Regulation , 2006 .

[36]  Doroteya Vladimirova,et al.  Waste to wealth: the circular economy advantage , 2015 .

[37]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[38]  Shana Smith,et al.  A novel selective parallel disassembly planning method for green design , 2015 .

[39]  G. Edward Gibson,et al.  Scope Management Using Project Definition Rating Index , 1997 .

[40]  Francis K.W. Wong,et al.  Strategic assessment of building adaptive reuse opportunities in Hong Kong , 2008 .

[41]  Chrisna Du Plessis,et al.  A strategic framework for sustainable construction in developing countries , 2007 .

[42]  Frank Schultmann,et al.  Corrigendum to “Building Information Modeling (BIM) for existing buildings — Literature review and future needs” [Autom. Constr. 38 (March 2014) 109–127] , 2014 .

[43]  Carl T. Haas,et al.  The role of geometric characterization in supporting structural steel reuse decisions , 2015 .

[44]  Francesco Pomponi,et al.  Circular economy for the built environment: A research framework , 2017 .

[45]  Mark Gorgolewski,et al.  Designing with reused building components: some challenges , 2008 .

[46]  Corey Andrew Wilson ADAPTIVE REUSE of INDUSTRIAL BUILDINGS in TORONTO, ONTARIO Evaluating Criteria for Determining Building Selection , 2010 .

[47]  Christopher Gorse,et al.  Refurbishment and Upgrading of Buildings , 2000 .

[48]  Paul Bowen,et al.  Sustainable construction: principles and a framework for attainment , 1997 .

[49]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[50]  Carl T. Haas,et al.  Multiple Heavy Lifts Optimization , 1996 .

[51]  P. Lacy,et al.  Waste To Wealth: The Circular Economy Advantage By Peter Lacy;Jakob Rutqvist , 2015 .

[52]  Peter A. Bullen Adaptive reuse and sustainability of commercial buildings , 2007 .

[53]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .

[54]  Sheila Conejos,et al.  Designing for better building adaptability: A comparison of adaptSTAR and ARP models , 2014 .

[55]  Brian Wilson,et al.  Investigating first planning in construction , 2006 .

[56]  Martin Skitmore,et al.  Investigating the impact of project definition clarity on project performance: Structural equation modeling study , 2015 .

[57]  Charles J. Kibert,et al.  The next generation of sustainable construction , 2007 .

[58]  Mario Fontana,et al.  Energy retrofit of a single-family house: Life cycle net energy saving and environmental benefits , 2013 .

[59]  G. Edward Gibson,et al.  Building Project Scope Definition Using Project Definition Rating Index , 2001 .

[60]  Peter W. G. Morris,et al.  Reconstructing Project Management: Morris/Reconstructing Project Management , 2013 .