Factors Towards Site Management Improvement for Industrialised Building System (IBS) Construction

Abstract Site management practicing the best method for Industrialised Building System (IBS) construction leads to favourable environment. This research aims to develop an integrated site management system improvement; the team work, the workplace and the materials & machinery for IBS construction. Questionnaire survey was distributed among 314, IBS contractors registered under CIDB. The result revealed that the improvement factors in site management for IBS construction categorised into five which include the management, workplace, work team, safety, and material and equipment. Thus, the research reinforced that the integration of all these factors is significant e towards the improvement of site management system for IBS construction.

[1]  John McManus The Role of the Project Manager , 1997 .

[2]  James Sommerville,et al.  Records management and information processing on construction sites using digital pen and paper , 2007 .

[3]  Norizan Ahmad,et al.  Assessing the Behavioural Factors' of Safety Culture for the Malaysian Construction Companies , 2012 .

[4]  Mohamad Kamar Kamarul Anuar,et al.  Industrialised building system (IBS): Current shortcomings and the vital roles of R&D , 2008 .

[5]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[6]  Ahmad Baharuddin Abd. Rahman,et al.  Issues and challenges in the implementation of Industrialised Building Systems in Malaysia , 2006 .

[7]  Zubair Ahmed Memon,et al.  A systematic procedure for developing the 3D model to evaluate the construction project progress , 2007 .

[8]  S. L. Tang Modern construction project management , 2003 .

[9]  Lamine. Mahdjoubi,et al.  An intelligent materials routing system on complex construction sites , 2001 .

[10]  Low Sui Pheng,et al.  Just‐in‐time management in precast concrete construction: a survey of the readiness of main contractors in Singapore , 2001 .

[11]  Hiroyuki Hirano,et al.  5 Pillars of the Visual Workplace , 1995 .

[12]  Jalan Pahang,et al.  BARRIERS TO INDUSTRIALIZED BUILDING SYSTEM (IBS): THE CASE OF MALAYSIA , 2009 .

[13]  Li yin Shen,et al.  Managing construction waste on‐site through system dynamics modelling: the case of Hong Kong , 2008 .

[14]  Salihudin Hassim,et al.  The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia , 2009 .