Using queuing theory and simulated annealing to design the facility layout in an AGV-based modular manufacturing system
暂无分享,去创建一个
[1] R. Sahin,et al. A simulated annealing algorithm to find approximate Pareto optimal solutions for the multi-objective facility layout problem , 2009 .
[2] Allan S. Tubaileh,et al. Single and multi-row layout design for flexible manufacturing systems , 2017, Int. J. Comput. Integr. Manuf..
[3] Adil Baykasoglu,et al. A simulated annealing algorithm for dynamic layout problem , 2001, Comput. Oper. Res..
[4] Henri Pierreval,et al. Dynamic facility layout problem based on open queuing network theory , 2017, Eur. J. Oper. Res..
[5] Hasan Hosseini-Nasab,et al. Classification of facility layout problems: a review study , 2018 .
[6] Zhen Yang,et al. Lagrangean relaxation and hybrid simulated annealing tabu search procedure for a two-echelon capacitated facility location problem with plant size selection , 2017, Int. J. Prod. Res..
[7] Matt Syal,et al. Material Flow-Based Facility Layout Analysis of a Manufactured Housing Production Plant , 2006 .
[8] Andrew Whyte,et al. Uptake of Off-site Construction: Benefit and Future Application , 2014 .
[9] Gündüz Ulusoy,et al. A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles , 1997, Comput. Oper. Res..
[10] R. J. V. Lee,et al. The company-wide effects of just-in-time manufacturing within an integrated materials handling system: a case study , 1991 .
[11] Márcia Elisa Soares Echeveste,et al. The role of modularity in sustainable design: A systematic review , 2018 .
[12] Dipl‐Ing. Ulrich Piepel. Mobile robots into the next century , 1989 .
[13] Udo Buscher,et al. Single row layout models , 2015, Eur. J. Oper. Res..
[14] Walid Ben-Ameur,et al. Computing the Initial Temperature of Simulated Annealing , 2004, Comput. Optim. Appl..
[15] Yavuz A. Bozer,et al. A new simulated annealing algorithm for the facility layout problem , 1996 .
[16] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[17] Marcos Ribeiro Pereira Barretto,et al. A solution to the facility layout problem using simulated annealing , 1998 .
[18] R. J. V. Lee,et al. The role of automated guided vehicles within cellular manufacturing as a shop floor contribution to CIM , 1991 .
[19] Henri Pierreval,et al. Facility layout problems: A survey , 2007, Annu. Rev. Control..
[20] Mohd Khairol Anuar Mohd Ariffin,et al. Hybrid multiobjective genetic algorithms for integrated dynamic scheduling and routing of jobs and automated-guided vehicle (AGV) in flexible manufacturing systems (FMS) environment , 2015 .
[21] Vincent F. Yu,et al. Solving the location-routing problem with simultaneous pickup and delivery by simulated annealing , 2016 .
[22] Huw Lewis,et al. AGV controlled FMS , 2000 .
[23] End Semester Me,et al. MANUFACTURING PROCESS-I , 2013 .
[24] Erdal Aydemir,et al. Breeder hybrid algorithm approach for natural gas demand forecasting model , 2017 .
[25] Ossama Salem,et al. Decision Support System for Manufactured Housing Facility Layout , 2008 .
[26] Asoo J. Vakharia,et al. Cell formation in group technology: review, evaluation and directions for future research , 1998 .
[27] Ihsan Sabuncuoglu,et al. Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system , 1992 .
[28] Sev V. Nagalingam,et al. A genetic algorithm and queuing theory based methodology for facilities layout problem , 2009 .
[29] C.S.P. Rao,et al. A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS , 2006 .
[30] Elwood S. Buffa,et al. A Heuristic Algorithm and Simulation Approach to Relative Location of Facilities , 1963 .
[31] Russell D. Meller,et al. The facility layout problem: Recent and emerging trends and perspectives , 1996 .
[32] B. J. Davies,et al. Simulation study of an AGV system in an FMS environment , 1988 .
[33] T. Koopmans,et al. Assignment Problems and the Location of Economic Activities , 1957 .
[34] Rrk Sharma,et al. A review of different approaches to the facility layout problems , 2006 .
[35] Yavuz A. Bozer,et al. A reexamination of the distance-based facility layout problem , 1997 .
[36] Pius J. Egbelu,et al. Material flow control in AGV/unit load based production lines , 1988 .