Measuring the Impact of Changing Requirements on Software Project Cost: An Empirical Investigation
暂无分享,去创建一个
[1] Frederick P. Brooks,et al. No Silver Bullet: Essence and Accidents of Software Engineering , 1987 .
[2] Daniela E. Damian,et al. Requirements Engineering and Downstream Software Development: Findings from a Case Study , 2005, Empirical Software Engineering.
[3] Susan P. Williams,et al. Requirements volatility & its impact on change effort: Evidence based research n software development projects , 2006 .
[4] Susan P. Williams,et al. Requirements Volatility and Its Impact on Change Effort: Evidence-based Research in Software Development Projects Return to Published Papers , 2006 .
[5] Tridas Mukhopadhyay,et al. Software Project Duration and Effort: An Empirical Study , 2002, Inf. Technol. Manag..
[6] Didar Zowghi,et al. A study of the impact of requirements volatility on software project performance , 2002, Ninth Asia-Pacific Software Engineering Conference, 2002..
[7] Doris L. Carver,et al. Analyzing the impact of changing requirements , 2001, Proceedings IEEE International Conference on Software Maintenance. ICSM 2001.
[8] Yashwant K. Malaiya,et al. Requirements volatility and defect density , 1999, Proceedings 10th International Symposium on Software Reliability Engineering (Cat. No.PR00443).
[9] M. R. Strens,et al. Change analysis: a step towards meeting the challenge of changing requirements , 1996, Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems.
[10] Dietmar Pfahl,et al. Using simulation to analyse the impact of software requirement volatility on project performance , 2000, Inf. Softw. Technol..
[11] Nadeem Ehsan,et al. An investigation of changing requirements with respect to development phases of a software project , 2010, 2010 International Conference on Computer Information Systems and Industrial Management Applications (CISIM).