A triple exponentially weighted moving average control chart for monitoring time between events

[1]  Thong Ngee Goh,et al.  CUSUM Chart with Transformed Exponential Data , 2006 .

[2]  Murat Caner Testik,et al.  Impact of model misspecification on the exponential EWMA charts: a robustness study when the time-between-events are not exponential , 2010, Qual. Reliab. Eng. Int..

[3]  Abdur Rahim,et al.  Time-Between-Event Control Charts for Sampling Inspection , 2014, Technometrics.

[4]  T. N. Goh,et al.  A Comparative Study of Exponential Time between Events Charts , 2006 .

[5]  Subhabrata Chakraborti,et al.  Phase II Shewhart‐type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation , 2016, Qual. Reliab. Eng. Int..

[6]  Stephen B. Vardeman,et al.  Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed , 1985 .

[7]  Ker-Chau Li,et al.  Slicing Regression: A Link-Free Regression Method , 1991 .

[8]  Fah Fatt Gan,et al.  Designs of One- and Two-Sided Exponential EWMA Charts , 1998 .

[9]  Thong Ngee Goh,et al.  Cumulative quantity control charts for monitoring production processes , 2000 .

[10]  Thong Ngee Goh,et al.  A study of EWMA chart with transformed exponential data , 2007 .

[11]  Chi-Hyuck Jun,et al.  Monitoring process mean using generally weighted moving average chart for exponentially distributed characteristics , 2015, Commun. Stat. Simul. Comput..

[12]  N. Balakrishnan,et al.  A generally weighted moving average chart for time between events , 2017 .

[13]  Charles W. Champ,et al.  Phase I control charts for times between events , 2002 .

[14]  Athanasios C. Rakitzis,et al.  Monitoring exponential data using two-sided control charts with runs rules , 2016 .

[15]  Min Xie,et al.  Monitoring of Time-Between-Events with a Generalized Group Runs Control Chart , 2016, Qual. Reliab. Eng. Int..

[16]  Christos Koukouvinos,et al.  A double exponentially weighted moving average chart for time between events , 2020, Commun. Stat. Simul. Comput..

[17]  Aamir Saghir,et al.  Modified EWMA control chart for transformed gamma data , 2019, Commun. Stat. Simul. Comput..

[18]  Muhammad Riaz,et al.  On developing an exponentially weighted moving average chart under progressive setup: An efficient approach to manufacturing processes , 2020, Qual. Reliab. Eng. Int..

[19]  Thong Ngee Goh,et al.  A control chart for the Gamma distribution as a model of time between events , 2007 .

[20]  Christos Koukouvinos,et al.  The triple exponentially weighted moving average control chart , 2020 .

[21]  Subha Chakraborti,et al.  Improved Phase I Control Charts for Monitoring Times Between Events , 2015, Qual. Reliab. Eng. Int..

[22]  Min Xie,et al.  Design of exponential control charts based on average time to signal using a sequential sampling scheme , 2015 .

[23]  Fah Fatt Gan Design of optimal exponential CUSUM control charts , 1994 .

[24]  James M. Lucas,et al.  Counted Data CUSUM's , 1985 .

[25]  Joel Smith,et al.  Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart , 2013 .

[26]  Philippe Castagliola,et al.  Exponential cumulative sums chart for detecting shifts in time-between-events , 2018, Int. J. Prod. Res..

[27]  Christian H. Weiß,et al.  Properties of the exponential EWMA chart with parameter estimation , 2010, Qual. Reliab. Eng. Int..

[28]  Min Xie,et al.  Design of Gamma Charts Based on Average Time to Signal , 2016, Qual. Reliab. Eng. Int..

[29]  Connie M. Borror,et al.  Robustness of the time between events CUSUM , 2003 .

[30]  Nirpeksh Kumar,et al.  Design and implementation of qth quantile‐unbiased tr‐chart for monitoring times between events , 2019, Qual. Reliab. Eng. Int..

[31]  Min Zhang,et al.  Exponential CUSUM Charts with Estimated Control Limits , 2014, Qual. Reliab. Eng. Int..

[32]  Christos Koukouvinos,et al.  A progressive mean control chart for monitoring time between events , 2019, Qual. Reliab. Eng. Int..

[33]  Christos Koukouvinos,et al.  Monitoring of time between events with a double generally weighted moving average control chart , 2018, Qual. Reliab. Eng. Int..