A triple exponentially weighted moving average control chart for monitoring time between events
暂无分享,去创建一个
Christos Koukouvinos | Vasileios Alevizakos | Kashinath Chatterjee | C. Koukouvinos | Vasileios Alevizakos | K. Chatterjee
[1] Thong Ngee Goh,et al. CUSUM Chart with Transformed Exponential Data , 2006 .
[2] Murat Caner Testik,et al. Impact of model misspecification on the exponential EWMA charts: a robustness study when the time-between-events are not exponential , 2010, Qual. Reliab. Eng. Int..
[3] Abdur Rahim,et al. Time-Between-Event Control Charts for Sampling Inspection , 2014, Technometrics.
[4] T. N. Goh,et al. A Comparative Study of Exponential Time between Events Charts , 2006 .
[5] Subhabrata Chakraborti,et al. Phase II Shewhart‐type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation , 2016, Qual. Reliab. Eng. Int..
[6] Stephen B. Vardeman,et al. Average Run Lengths for CUSUM Schemes When Observations Are Exponentially Distributed , 1985 .
[7] Ker-Chau Li,et al. Slicing Regression: A Link-Free Regression Method , 1991 .
[8] Fah Fatt Gan,et al. Designs of One- and Two-Sided Exponential EWMA Charts , 1998 .
[9] Thong Ngee Goh,et al. Cumulative quantity control charts for monitoring production processes , 2000 .
[10] Thong Ngee Goh,et al. A study of EWMA chart with transformed exponential data , 2007 .
[11] Chi-Hyuck Jun,et al. Monitoring process mean using generally weighted moving average chart for exponentially distributed characteristics , 2015, Commun. Stat. Simul. Comput..
[12] N. Balakrishnan,et al. A generally weighted moving average chart for time between events , 2017 .
[13] Charles W. Champ,et al. Phase I control charts for times between events , 2002 .
[14] Athanasios C. Rakitzis,et al. Monitoring exponential data using two-sided control charts with runs rules , 2016 .
[15] Min Xie,et al. Monitoring of Time-Between-Events with a Generalized Group Runs Control Chart , 2016, Qual. Reliab. Eng. Int..
[16] Christos Koukouvinos,et al. A double exponentially weighted moving average chart for time between events , 2020, Commun. Stat. Simul. Comput..
[17] Aamir Saghir,et al. Modified EWMA control chart for transformed gamma data , 2019, Commun. Stat. Simul. Comput..
[18] Muhammad Riaz,et al. On developing an exponentially weighted moving average chart under progressive setup: An efficient approach to manufacturing processes , 2020, Qual. Reliab. Eng. Int..
[19] Thong Ngee Goh,et al. A control chart for the Gamma distribution as a model of time between events , 2007 .
[20] Christos Koukouvinos,et al. The triple exponentially weighted moving average control chart , 2020 .
[21] Subha Chakraborti,et al. Improved Phase I Control Charts for Monitoring Times Between Events , 2015, Qual. Reliab. Eng. Int..
[22] Min Xie,et al. Design of exponential control charts based on average time to signal using a sequential sampling scheme , 2015 .
[23] Fah Fatt Gan. Design of optimal exponential CUSUM control charts , 1994 .
[24] James M. Lucas,et al. Counted Data CUSUM's , 1985 .
[25] Joel Smith,et al. Control Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart , 2013 .
[26] Philippe Castagliola,et al. Exponential cumulative sums chart for detecting shifts in time-between-events , 2018, Int. J. Prod. Res..
[27] Christian H. Weiß,et al. Properties of the exponential EWMA chart with parameter estimation , 2010, Qual. Reliab. Eng. Int..
[28] Min Xie,et al. Design of Gamma Charts Based on Average Time to Signal , 2016, Qual. Reliab. Eng. Int..
[29] Connie M. Borror,et al. Robustness of the time between events CUSUM , 2003 .
[30] Nirpeksh Kumar,et al. Design and implementation of qth quantile‐unbiased tr‐chart for monitoring times between events , 2019, Qual. Reliab. Eng. Int..
[31] Min Zhang,et al. Exponential CUSUM Charts with Estimated Control Limits , 2014, Qual. Reliab. Eng. Int..
[32] Christos Koukouvinos,et al. A progressive mean control chart for monitoring time between events , 2019, Qual. Reliab. Eng. Int..
[33] Christos Koukouvinos,et al. Monitoring of time between events with a double generally weighted moving average control chart , 2018, Qual. Reliab. Eng. Int..