A methodology for preventive maintenance analysis under transient response
暂无分享,去创建一个
[1] Frank Proschan,et al. Optimum Replacement of a System Subject to Shocks , 1983, Oper. Res..
[2] S. L. Albin,et al. Preventive replacement in systems with dependent components , 1992 .
[3] Xitong Zheng,et al. Hazard-rate tolerance method for an opportunistic-replacement policy , 1992 .
[4] Alain Haurie,et al. Preventive Replacement for Multicomponent Systems: An Opportunistic Discrete-Time Dynamic Programming Model , 1983, IEEE Transactions on Reliability.
[5] Kailash C. Kapur,et al. Reliability in engineering design , 1977 .
[6] Mazhar Ali Khan Malik,et al. Reliable Preventive Maintenance Scheduling , 1979 .
[7] Sheldon M. Ross. Introduction to Probability Models. , 1995 .
[8] William P. Pierskalla,et al. A survey of maintenance models: The control and surveillance of deteriorating systems , 1976 .
[9] Marlin U. Thomas,et al. Evaluation of an Opportunistic Replacement Policy for a 2-Unit System , 1986, IEEE Transactions on Reliability.
[10] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[11] Sheldon M. Ross,et al. Introduction to probability models , 1975 .
[12] E. A. Elsayed,et al. An optimum group maintenance policy , 1983 .
[13] C. Tilquin,et al. The Age Replacement Problem with Minimal Repair and Random Repair Costs , 1979, Oper. Res..
[14] V. Jayabalan,et al. Cost optimization of maintenance scheduling for a system with assured reliability , 1992 .
[15] Toshio Nakagawa,et al. Modified periodic preventive maintenance policies , 1983 .
[16] Peter H. Ritchken,et al. m,T Group Maintenance Policies , 1990 .
[17] Young Ho Chun,et al. An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.
[18] Randall P. Sadowski,et al. Introduction to Simulation Using Siman , 1990 .
[19] Nasser Fard,et al. An approximate method for non-repairable systems based on oppurtunistic replacement policy , 1991 .
[20] R. Cléroux,et al. Block Replacement Policies with General Cost Structures , 1975 .
[21] Ilya B. Gertsbakh,et al. Models of Preventive Maintenance , 1977 .
[22] Mahmut Parlar,et al. A survey of maintenance models for multi-unit systems , 1991 .
[23] N. Jack,et al. Repair Replacement Modelling over Finite Time Horizons , 1991 .
[24] Toshiro Tango,et al. Extended block replacement policy with used items , 1978, Journal of Applied Probability.
[25] Avijit Banerjee,et al. A simulation study of some maintenance policies in a group technology shop , 1987 .
[26] R. V. Canfield,et al. Cost Optimization of Periodic Preventive Maintenance , 1986, IEEE Transactions on Reliability.
[27] M. N. Gopalan,et al. Cost analysis of a two unit repairable system subject to on-line preventive maintenance and/or repair , 1995 .
[28] P. Wartenhorst,et al. Transient failure behaviour of repairable systems , 1991 .
[29] Bernard T. Lewis,et al. Readings in maintenance management , 1973 .
[30] Michael Scriabin,et al. Maintenance Scheduling for Multicomponent Equipment , 1977 .
[31] Frank Proschan,et al. Periodic Replacement with Increasing Minimal Repair Costs at Failure , 1982, Oper. Res..
[32] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .
[33] Toshio Nakagawa,et al. Optimal Number of Failures before Replacement Time , 1983, IEEE Transactions on Reliability.
[34] John G. Wilson,et al. Optimal m-failure policies with random repair time , 1990 .
[35] Menachem Berg,et al. A note on a modified block replacement policy for units with increasing marginal running costs , 1979 .
[36] Y. S. Sherif,et al. Optimal maintenance models for systems subject to failure–A Review , 1981 .
[37] O. Geoffrey Okogbaa,et al. A HEURISTIC REPLACEMENT SCHEDULING APPROACH FOR MULTI-UNIT SYSTEMS WITH ECONOMIC DEPENDENCY , 1996 .
[38] Davinder P.S. Sethi. OPPORTUNISTIC REPLACEMENT POLICIES , 1977 .