Redução da instabilidade e melhoria de desempenho do sistema MRP

The paper presents a method designed to get an improvement of the system performance in a case study, a large company that produces materials for writing. The method arises from a literature survey and from the particular characteristics of the case study. The method argues that the improvement on MRP performance is attained by system nervousness reduction which is supported by two main factors: i) system parameters must be determined in a precise way; ii) integrated production planning and scheduling focused on development of a realistic Master Production Schedule (MPS), which takes account the system capacity. The method was applied and the results were: reduction of system nervousness, reduction of inventory costs, improvement of service level, increase of the workers satisfaction and increase the reliance on the MRP system.

[1]  Urban Wemmerlöv A time-phased order-point system in environments with and without demand uncertainty: a comparative analysis of non-monetary performance variables , 1986 .

[2]  Jeff Hoi Yan Yeung,et al.  MPS with multiple freeze fences in multi-product multi-level MRP systems , 1999 .

[3]  F. Robert Jacobs,et al.  A Comparison of Reorder Point and Material Requirements Planning Inventory Control Logic , 1992 .

[4]  Reuven Karni Capacity requirements planning— a systematization , 1982 .

[5]  Horst Tempelmeier,et al.  Resource-constrained materials requirements planning- MRP rc , 1997 .

[6]  Chrwan-Jyh Ho,et al.  Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness , 2002 .

[7]  Chrwan-Jyh Ho,et al.  Evaluating the impact of operating environments on MRP system nervousness , 1989 .

[8]  Lin Ma,et al.  The impact of using multiple freeze fences on costs in MRP systems , 2003 .

[9]  Chrwan-Jyh Ho,et al.  Evaluating the effectiveness of using lot-sizing rules to cope with MRP system nervousness , 1999 .

[10]  Chrwan-Jyh Ho,et al.  Uncertainty-dampening methods for reducing MRP system nervousness , 1995 .

[11]  Mj Mark Euwe,et al.  The value of rescheduling functionality within standard MRP packages , 1998 .

[12]  Sukran N. Kadipasaoglu,et al.  Measurement of instability in multi-level MRP systems , 1997 .

[13]  Silvanus T. Enns MRP performance effects due to forecast bias and demand uncertainty , 2002, Eur. J. Oper. Res..

[14]  H Mather,et al.  Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .

[15]  Sameh M. Saad,et al.  Uncertainty under MRP-planned manufacture: Review and categorization , 2002 .

[16]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[17]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .

[18]  Brian G. Kingsman,et al.  Properties of lot-sizing rules under lumpy demand , 2003 .

[19]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[20]  Bart L. MacCarthy,et al.  A multi-dimensional classification of production systems for the design and selection of production planning and control systems , 2000 .

[21]  Martin Taal,et al.  Integrating MRP and finite capacity planning , 1997 .

[22]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[23]  A. S. Godoy A pesquisa qualitativa e sua utilização em Administração de Empresas , 1995 .

[24]  T. C. Ireland,et al.  Correlating MRP system nervousness with forecast errors , 1998 .

[25]  Jinxing Xie,et al.  Freezing the master production schedule under single resource constraint and demand uncertainty , 2003 .

[26]  Xiande Zhao,et al.  Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .

[27]  Jeff Hoi Yan Yeung,et al.  Parameters affecting the effectiveness of MRP systems: A review , 1998 .

[28]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[29]  Jan Olhager,et al.  The effect of MRP lot sizing on actual cumulative lead times in multi-level systems , 1998 .

[30]  Petri Hautaniemi,et al.  The choice of replenishment policies in an MRP environment , 1999 .