A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
暂无分享,去创建一个
[1] S. Binato,et al. A GRASP FOR JOB SHOP SCHEDULING , 2001 .
[2] Yeong-Dae Kim,et al. Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness , 1993 .
[3] Venkata Ranga Neppalli,et al. Minimizing total flow time in a two-machine flowshop problem with minimum makespan , 2001 .
[4] Mauricio G. C. Resende,et al. Greedy Randomized Adaptive Search Procedures , 1995, J. Glob. Optim..
[5] Chandrasekharan Rajendran,et al. A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimization , 1999 .
[6] G. Prabhaharan,et al. Implementation of grasp in flow shop scheduling , 2006 .
[7] A. Nagar,et al. Multiple and bicriteria scheduling : A literature survey , 1995 .
[8] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[9] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[10] R. L. Daniels,et al. Multiobjective flow-shop scheduling , 1990 .
[11] Panos M. Pardalos,et al. A Greedy Randomized Adaptive Search Procedure for the Feedback Vertex Set Problem , 1998, J. Comb. Optim..
[12] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[13] E. Ignall,et al. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems , 1965 .
[14] C. Rajendran,et al. Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell , 1998 .
[15] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[16] Andrew W. Shogan,et al. Semi-greedy heuristics: An empirical study , 1987 .
[17] Chandrasekharan Rajendran,et al. A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs , 2005, Eur. J. Oper. Res..
[18] Yeong-Dae Kim. Minimizing total tardiness in permutation flowshops , 1995 .
[19] Ali Allahverdi,et al. The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime , 2003, Eur. J. Oper. Res..