A reliability-based approach to transmission maintenance planning and its application in BC hydro system
暂无分享,去创建一个
[1] J. K. Korczynski,et al. Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro system , 1995 .
[2] M.Th. Schilling,et al. Generation maintenance scheduling considering transmission constraints , 2000 .
[3] Junichi Toyoda,et al. Optimal generating unit maintenance scheduling for multi-area system with network constraints , 1991 .
[4] E. Vaahedi,et al. Determining number and timing of substation spare transformers using a probabilistic cost analysis approach , 1999 .
[5] D. Chattopadhyay. A practical maintenance scheduling program mathematical model and case study , 1998 .
[6] Wenyuan Li,et al. Incorporation of voltage stability operating limits in composite system adequacy assessment: BC Hydro's experience , 1998 .
[7] H. M. Merrill,et al. Power plant maintenance scheduling: optimizing economics and reliability , 1991 .
[8] Ghavameddin Nourbakhsh,et al. Maintenance considerations in applied substation reliability assessment , 1997 .
[9] Jay Yellen,et al. A decomposition approach to unit maintenance scheduling , 1992 .
[10] Roy Billinton,et al. Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte-Carlo simulation and enumeration technique , 1991 .
[11] Roy Billinton,et al. Generating Unit Maintenance Scheduling for Single and Two Interconnected Systems , 1984, IEEE Power Engineering Review.
[12] Wenyuan Li,et al. Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .
[13] M. E. Beehler,et al. Reliability centered maintenance for transmission systems , 1996 .