A reliability-based approach to transmission maintenance planning and its application in BC hydro system

This paper presents a reliability-based method for transmission maintenance planning. A quantified impact assessment of the planned outage on operation reliability of the whole transmission system is a main feature of the proposed method. This reliability centered maintenance (RCM) approach for transmission systems provides not only the lowest risk maintenance schedule but also the most reliable operation mode for the planned outage. Another feature of the method is ease of incorporation into the existing traditional transmission maintenance procedure. A time-shift-based Monte Carlo simulation technique and a linear programming optimization model are used to perform reliability evaluation of the transmission system with planned outage(s). An example for the planned replacement of a 230-kV cable in the BC Hydro North Metro system has been given to demonstrate a practical application of the proposed procedure and the method.

[1]  J. K. Korczynski,et al.  Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro system , 1995 .

[2]  M.Th. Schilling,et al.  Generation maintenance scheduling considering transmission constraints , 2000 .

[3]  Junichi Toyoda,et al.  Optimal generating unit maintenance scheduling for multi-area system with network constraints , 1991 .

[4]  E. Vaahedi,et al.  Determining number and timing of substation spare transformers using a probabilistic cost analysis approach , 1999 .

[5]  D. Chattopadhyay A practical maintenance scheduling program mathematical model and case study , 1998 .

[6]  Wenyuan Li,et al.  Incorporation of voltage stability operating limits in composite system adequacy assessment: BC Hydro's experience , 1998 .

[7]  H. M. Merrill,et al.  Power plant maintenance scheduling: optimizing economics and reliability , 1991 .

[8]  Ghavameddin Nourbakhsh,et al.  Maintenance considerations in applied substation reliability assessment , 1997 .

[9]  Jay Yellen,et al.  A decomposition approach to unit maintenance scheduling , 1992 .

[10]  Roy Billinton,et al.  Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte-Carlo simulation and enumeration technique , 1991 .

[11]  Roy Billinton,et al.  Generating Unit Maintenance Scheduling for Single and Two Interconnected Systems , 1984, IEEE Power Engineering Review.

[12]  Wenyuan Li,et al.  Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .

[13]  M. E. Beehler,et al.  Reliability centered maintenance for transmission systems , 1996 .