Improved implicit optimal modeling of the labor shift scheduling problem
暂无分享,去创建一个
[1] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[2] M. Segal,et al. The Operator-Scheduling Problem: A Network-Flow Approach , 1974, Oper. Res..
[3] Elwood S. Buffa,et al. AN INTEGRATED WORK SHIFT SCHEDULING SYSTEM , 1976 .
[4] William L. Berry,et al. Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis , 1976 .
[5] W. L. Berry,et al. DETERMINING OPTIMAL SHIFT SCHEDULES FOR TELEPHONE TRAFFIC EXCHANGE OPERATORS , 1977 .
[6] Leon F. McGinnis,et al. One- and two-phase heuristics for workforce scheduling , 1978 .
[7] Michael J. Showalter,et al. Simple Approaches to Shift, Days-Off and Tour Scheduling Problems , 1983 .
[8] F. Glover,et al. A heuristic programming approach to the employee scheduling problem and some thoughts on “managerial robots” , 1984 .
[9] John Field,et al. Personnel scheduling with flexshift models , 1985 .
[10] Gary Manford Thompson. A comparison of techniques for scheduling non-homogeneous employees in a service environment subject to non-cyclical demand (volumes I and II) , 1988 .
[11] Stephen E. Bechtold,et al. Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .
[12] V. Mabert,et al. Measuring the impact of part-time workers in service organizations , 1990 .
[13] Stephen E. Bechtold,et al. Improvement of Labour Utilisation in Shift Scheduling for Services with Implicit Optimal Modelling , 1991 .
[14] Gary M. Thompson. Improving the Utilization of Front-Line Service Delivery System Personnel* , 1992 .
[15] Gary Thomp. Improved Implicit Optimal Modeling of the Labor Shift S cheduling Problem , 1995 .
[16] Michael J. Brusco,et al. A sequential integer programming method for discontinuous labor tour scheduling , 1996 .