Transmission network planning considering line maintenance plan with new energy resources integration

In this paper, a stochastic optimization model of transmission network planning considering annual planned maintenance of lines under new energy integration is proposed. This model combines the planning model and maintenance model together, and can determine the optimal transmission capacity of lines and the annual maintenance plan simultaneously. In addition, in order to take into account the uncertainty of wind power output, the multi-scenario probabilistic method is used, and the nonlinear constraints in the model is equivalently linearized, therefore the model can be converted into a mixed integer linear model and can be directly solved by the commercial solver. To validate its effectiveness and superiority, the proposed stochastic optimization model is tested on the IEEE RTS-24 system.

[1]  M. Mohsin,et al.  Estimation of Weibull Distribution Parameters and Wind Power Density for Wind Farm Site at Akal at Jaisalmer in Rajasthan , 2018, 2018 3rd International Innovative Applications of Computational Intelligence on Power, Energy and Controls with their Impact on Humanity (CIPECH).

[2]  Haozhong Cheng,et al.  Fast Transmission Network Expansion Planning Considering the N-2 Security Criterion , 2018, 2018 2nd IEEE Conference on Energy Internet and Energy System Integration (EI2).

[3]  Rubén Romero,et al.  Transmission and Generation Expansion Planning Considering System Reliability and Line Maintenance , 2018, Electrical Engineering (ICEE), Iranian Conference on.

[4]  Chong Wang,et al.  Short-term transmission line maintenance scheduling with wind energy integration , 2017, 2017 IEEE Power & Energy Society General Meeting.

[5]  Pingliang Zeng,et al.  Transmission planning considering spatial correlation of wind power , 2016, 2016 IEEE PES 13th International Conference on Transmission & Distribution Construction, Operation & Live-Line Maintenance (ESMO).

[6]  Mahmoud I. Soliman,et al.  Transmission network reconfiguration for reliable operation , 2015, 2015 50th International Universities Power Engineering Conference (UPEC).

[7]  Mostafa Aliyari,et al.  Reliability performance analysis in power distribution system using Weibull distribution-A case study , 2013, 18th Electric Power Distribution Conference.

[8]  Xiaochuan Luo,et al.  Corrective Line Switching With Security Constraints for the Base and Contingency Cases , 2013, IEEE Transactions on Power Systems.

[9]  Jaeseok Choi A method for transmission system expansion planning considering probabilistic reliability criteria , 2005, IEEE Transactions on Power Systems.

[10]  Gary W. Chang,et al.  A practical mixed integer linear programming-based short-term hydro scheduling , 2002, IEEE/PES Transmission and Distribution Conference and Exhibition.

[11]  Chen Jinfu,et al.  Generator maintenance scheduling in the generation expansion planning of interconnected power system , 2002, IEEE/PES Transmission and Distribution Conference and Exhibition.

[12]  A. Monticelli,et al.  Test systems and mathematical models for transmission network expansion planning , 2002 .

[13]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[14]  Yong Fu,et al.  A Fully Parallel Stochastic Multiarea Power System Operation Considering Large-Scale Wind Power Integration , 2018, IEEE Transactions on Sustainable Energy.