Capacity planning with capability for multiple semiconductor manufacturing fabs
暂无分享,去创建一个
[1] Tadeusz Sawik. Balancing and scheduling of surface mount technology lines , 2002 .
[2] John B. Jensen,et al. An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .
[3] Vincent A. Mabert,et al. AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .
[4] Purushothaman Damodaran,et al. Comparison of push and pull systems with transporters: A metamodelling approach , 2002 .
[5] Ihsan Sabuncuoglu,et al. A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops , 2000, Decis. Sci..
[6] James C. Chen,et al. Capacity planning for a twin fab , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[7] Roberto Cigolini,et al. Order review and release strategies ina job shop environment: A review and a classification , 1997 .
[8] Warren W. Fisher,et al. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .
[9] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[10] Robert C. Leachman,et al. On Capacity Modeling for Production Planning with Alternative Machine Types , 1992 .