Using lean principles to improve outpatient adult infusion clinic chemotherapy preparation turnaround times.

PURPOSE The workflow and chemotherapy preparation turnaround times at an adult infusion clinic were evaluated to identify opportunities to optimize workflow and efficiency. METHODS A three-phase study using Lean Six Sigma methodology was conducted. In phase 1, chemotherapy turnaround times in the adult infusion clinic were examined one year after the interim goal of a 45-minute turnaround time was established. Phase 2 implemented various experiments including a five-day Kaizen event, using lean principles in an effort to decrease chemotherapy preparation turnaround times in a controlled setting. Phase 3 included the implementation of process-improvement strategies identified during the Kaizen event, coupled with a final refinement of operational processes. RESULTS In phase 1, the mean turnaround time for all chemotherapy preparations decreased from 60 to 44 minutes, and a mean of 52 orders for adult outpatient chemotherapy infusions was received each day. After installing new processes, the mean turnaround time had improved to 37 minutes for each chemotherapy preparation in phase 2. In phase 3, the mean turnaround time decreased from 37 to 26 minutes. The overall mean turnaround time was reduced by 26 minutes, representing a 57% decrease in turnaround times in 19 months through the elimination of waste and the implementation of lean principles. This reduction was accomplished through increased efficiencies in the workplace, with no addition of human resources. CONCLUSION Implementation of Lean Six Sigma principles improved workflow and efficiency at an adult infusion clinic and reduced the overall chemotherapy turnaround times from 60 to 26 minutes.

[1]  D. Eitel,et al.  Improving service quality by understanding emergency department flow: a White Paper and position statement prepared for the American Academy of Emergency Medicine. , 2010, The Journal of emergency medicine.

[2]  A. Mariotto,et al.  Current and future utilization of services from medical oncologists. , 2008, Journal of clinical oncology : official journal of the American Society of Clinical Oncology.

[3]  Michael T. Halpern,et al.  Prevalence of Outpatient Cancer Treatment in the United States: Estimates from the Medical Panel Expenditures Survey (MEPS) , 2008, Cancer investigation.

[4]  John Shook Toyota's secret: the A3 report , 2009 .

[5]  AlissA l. McDowell,et al.  Selecting a pharmacy layout design using a weighted scoring system. , 2012, American journal of health-system pharmacy : AJHP : official journal of the American Society of Health-System Pharmacists.

[6]  Stephen F Eckel,et al.  Analyzing methods for improved management of workflow in an outpatient pharmacy setting. , 2012, American journal of health-system pharmacy : AJHP : official journal of the American Society of Health-System Pharmacists.

[7]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[8]  Sabi Singh,et al.  Application of lean manufacturing techniques in the Emergency Department. , 2009, The Journal of emergency medicine.

[9]  Roger. T. Anderson,et al.  The relationship between patient's perceived waiting time and office-based practice satisfaction. , 2006, North Carolina medical journal.

[10]  S. J. Knoer,et al.  Effect of lean process improvement techniques on a university hospital inpatient pharmacy. , 2009, American journal of health-system pharmacy : AJHP : official journal of the American Society of Health-System Pharmacists.

[11]  Elaine L. Towle,et al.  Oncology Practice Trends From the National Practice Benchmark, 2005 through 2010. , 2011, Journal of oncology practice.