Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles

Tower cranes are one of the major equipments used in the construction of high-rise buildings. Simulation is an effective tool in modeling complex construction operations such as tower crane lifting. Lean principles combined with a simulation module can significantly reduce the cost and improve time management of construction. This paper presents an integrated system dynamics model with Lean concepts to simulate tower crane operations. This paper also presents a new type of tower crane with the following innovative futures: 1) two jibs; 2) propellers to swing the crane; and 3) wireless video monitoring technology. This double-jib crane will potentiality improve the productivity of the crane operation. A case example is presented and the results of the model are used to illustrate the advantages of utilizing a double-jib crane in the construction process. The results indicate that advance simulation techniques can minimize the resource requirements of crane operation.

[1]  Osama Moselhi,et al.  Computer-aided equipment selection for transporting and placing concrete , 1993 .

[2]  Yasser Abdel-Rady I. Mohamed,et al.  Special purpose simulation modeling of tower cranes , 2002, Proceedings of the Winter Simulation Conference.

[3]  Arthur W T Leung SCHEDULING FOR HIGH-RISE BUILDING CONSTRUCTION USING SIMULATION TECHNIQUES , 2003 .

[4]  Osama Moselhi,et al.  HYBRID EXPERT SYSTEM FOR CONSTRUCTION PLANNING AND SCHEDULING , 1990 .

[5]  O. Shaked,et al.  CONSCHED : expert system for scheduling of modular construction projects , 1992 .

[6]  Simaan M. AbouRizk,et al.  CEPM 1: special purpose simulation modeling of tower cranes , 2002, WSC '02.

[7]  Sang-Hyun Cho,et al.  Basic construction of intelligent expert system for riser design using database system and optimisation tools , 2005 .

[8]  Jonathan Jingsheng Shi,et al.  ACTIVITY-BASED CONSTRUCTION (ABC) MODELING AND SIMULATION METHOD , 1999 .

[9]  T LeungAW,et al.  Scheduling for high-rise building construction using simulation techniques , 2003 .

[10]  Simaan M. AbouRizk,et al.  Resource-based modeling for construction simulation , 1997 .

[11]  Yun-Kung Chung,et al.  A neuro-based expert system for facility layout construction , 1999, J. Intell. Manuf..

[12]  Mustafa Alshawi,et al.  An expert system to assist in generating and scheduling construction activities , 1991 .

[13]  Mohamed Al-Hussein,et al.  Integrating 3D visualization and simulation for tower crane operations on construction sites , 2006 .