Workflow Optimization with FlowOpt: On Modelling, Optimizing, Visualizing, and Analysing Production Workflows
暂无分享,去创建一个
Roman Bart´k | Milan Jaska | Ladislav Nov´k | Vladimir Rovensky | Tomas Skalicky | Martin Cully | Con Sheahan | Dang Thanh-Tung
[1] Roman Barták,et al. Extension of O(n log n) Filtering Algorithms for the Unary Resource Constraint to Optional Activities , 2005, Constraints.
[2] Mark Abramson,et al. Executing Reactive, Model-based Programs through Graph-based Temporal Planning , 2001, IJCAI.
[3] J. Christopher Beck,et al. Constraint-directed techniques for scheduling alternative activities , 2000, Artif. Intell..
[4] Philippe Laborie,et al. IBM ILOG CP Optimizer for Detailed Scheduling Illustrated on Three Problems , 2009, CPAIOR.
[5] Roman Barták,et al. Temporal Networks with Alternatives: Complexity and Model , 2007, FLAIRS.
[6] Hyerim Bae,et al. Automatic control of workflow processes using ECA rules , 2004, IEEE Transactions on Knowledge and Data Engineering.
[7] Roman BartákTomáš Skalický. A local approach to automated correction of violated precedence and resource constraints in manually altered schedules , 2009 .
[8] Roman Barták,et al. From enterprise models to scheduling models: bridging the gap , 2010, J. Intell. Manuf..
[9] Philippe Laborie,et al. Reasoning with Conditional Time-Intervals , 2008, FLAIRS.
[10] Roman Barták,et al. Nested Precedence Networks with Alternatives: Recognition, Tractability, and Models , 2008, AIMSA.
[11] Gerhard Friedrich,et al. Handling Alternative Activities in Resource-Constrained Project Scheduling Problems , 2007, IJCAI.