Challenges of Early Estimation of Infrastructure Projects within the UK: an Information Perspective

This research examines the challenges of early cost estimation of infrastructure projects within the UK with a focus on why cost overruns are such a persistent issue. The research was carried out by an investigation of existing literature surrounding early estimation in construction, characteristics of UK-based infrastructure projects and cost overruns within infrastructure projects. The data were collected through fourteen semi-structured interviews with estimating professionals who work predominantly on infrastructure projects across the UK. The key findings were that the early estimation process consists of an intricate system of hard and soft information exchange from the many involved parties due to the social and political nature of infrastructure projects; this provides many challenges for the estimator. This led to the idea that an estimate is actually a soft input itself and should not be taken as a hard numerical figure but something which requires human interpretation. Moreover, these challenges are heightened by the number of unknowns and uncertainties that are again part of the very nature of large scale infrastructure projects. This is difficult to address as it is the process of converting soft information into hard information and when soft information is hardened it will inevitably lose some of its information or context. Unfortunately, cost estimates have become to be accepted as hard information even when it is known to be soft information that requires interpretation and sense making.

[1]  Christophe J. Godlewski,et al.  Credit Risk Management in Banks: Hard Information, Soft Information and Manipulation , 2005 .

[2]  P. Love,et al.  Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects , 2018, Transportation Research Part A: Policy and Practice.

[3]  Bm Bert Sadowski,et al.  Infrastructure: the social value of shared resources , 2014 .

[4]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[5]  Knut Samset,et al.  Early Project Appraisal: Making the Initial Choices , 2010 .

[6]  Douglas J. Ferry Cost Planning of Buildings , 1980 .

[7]  Peter E.D. Love,et al.  Building Design Cost Management , 2002 .

[8]  Alfredo Serpell,et al.  Towards a knowledge-based assessment of conceptual cost estimates , 2004 .

[9]  R. Betteridge Successful experience of using function points to estimate project costs early in the life-cycle , 1992, Inf. Softw. Technol..

[10]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[11]  Jeremy Bertomeu,et al.  A Theory of Hard and Soft Information , 2016 .

[12]  M. Petersen,et al.  Information: Hard and Soft , 2018, The Review of Corporate Finance Studies.

[13]  A. Crane Rethinking construction. , 1999, Health estate.

[14]  Neil N. Eldin,et al.  Pilot study of quality function deployment in construction projects , 2003 .

[15]  M. Siemiatycki Cost Overruns on Infrastructure Projects: Patterns, Cause, and Cures , 2016 .

[16]  D. Kahneman,et al.  Delusions of success. How optimism undermines executives' decisions. , 2003, Harvard business review.

[17]  磯部 裕幸,et al.  Royal Institution of Chartered Surveyors(RICS)の紹介と日本における今後の展開 , 2011 .

[18]  Rifat Sonmez,et al.  Conceptual cost estimation of building projects with regression analysis and neural networks , 2004 .

[19]  Ajibade Ayodeji Aibinu,et al.  The accuracy of pre‐tender building cost estimates in Australia , 2008 .

[20]  B. Flyvbjerg,et al.  Should We Build More Large Dams? The Actual Costs of Hydropower Megaproject Development , 2014, 1409.0002.

[21]  Andrew D.F. Price,et al.  Conceptual phase of construction projects , 1995 .

[22]  S. Asmervik,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2004 .

[23]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[24]  Garold D. Oberlender,et al.  Predicting accuracy of early cost estimates based on estimate quality , 2001 .

[25]  M. Arab A function-based cost model for early cost advice on new-build schools projects , 2011 .