Modeling contractors' project selection and markup decisions influenced by eminence

Abstract To be successful in a competitive environment, contractors have to prepare their bids wisely. The two main decisions they have to make are the project selection decision and the markup selection decision. This paper proposes a new optimization model that combines these two main decisions. It also takes into account the importance of eminence and previous works as the most important non-monetary evaluation criterion used by owners for evaluating bids. These factors combined with the two decisions make this model complex and nonlinear. To solve this model, a customized Genetic Algorithm is developed. Using Monte Carlo simulation, the result of the model is compared to the results of conventional models that only consider bidding markups. The comparison shows that considering eminence can increase the expected profit of the contractor to more than 25% under some evaluation criteria mindsets of the owner.

[1]  William Vickrey,et al.  Counterspeculation, Auctions, And Competitive Sealed Tenders , 1961 .

[2]  M. Gates Bidding Strategies and Probabilities , 1967 .

[3]  F. Decarolis,et al.  The Awarding of Public Works in Italy: An Analysis of the Mechanisms for the Selection of Contractors , 2010 .

[4]  Sou-Sen Leu,et al.  RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .

[5]  B. Kayis,et al.  The relative importance of tender evaluation and contractor selection criteria , 2010 .

[6]  Martin Skitmore,et al.  Identifying non-competitive bids in construction contract auctions , 2002 .

[7]  James P. Clements,et al.  Successful Project Management , 1999 .

[8]  Harry J. Paarsch,et al.  Investigating bid preferences at low-price, sealed-bid auctions with endogenous participation , 2009 .

[9]  Boyd C. Paulson,et al.  Professional construction management : including C.M., design-construct, and general contracting , 1992 .

[10]  Irtishad Ahmad,et al.  Questionnaire Survey on Bidding in Construction , 1988 .

[11]  Abdulrezak N. Mohamed,et al.  A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions , 2007 .

[12]  Sangwook Lee,et al.  Bid-markup determination for microtunneling projects , 2004 .

[13]  Sidhartha S. Padhi,et al.  Centralized bid evaluation for awarding of construction projects – A case of India government , 2010 .

[14]  Anthony N. Pettitt,et al.  Gates' bidding model , 2007 .

[15]  Weng Tat Chan,et al.  CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS , 1996 .

[16]  Catherine P. Killen,et al.  Understanding project interdependencies: The role of visual representation, culture and process , 2012 .

[17]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[18]  Ching-Torng Lin,et al.  Bid/no-bid decision-making – a fuzzy linguistic approach , 2004 .

[19]  B. Kayis,et al.  Identifying key factors in the evaluation of tenders for projects and services , 2009 .

[20]  K. Lai,et al.  A method used for evaluating bids in the chinese construction industry , 2004 .

[21]  Sou-Sen Leu,et al.  Average-Bid Method—Competitive Bidding Strategy , 1993 .

[22]  L. Friedman A Competitive-Bidding Strategy , 1956 .

[23]  Fletcher Griffis,et al.  Bidding Strategy: Winning over Key Competitors , 1992 .

[24]  Derek S. Drew,et al.  A comparison of contractors’ decision to bid behaviour according to different market environments , 2008 .

[25]  Maurizio Naldi,et al.  Detection of anomalous bids in procurement auctions , 2008, Decis. Support Syst..

[26]  Abdulrezak N. Mohamed,et al.  SCBMD: A knowledge-based system software for strategically correct bid/no bid and mark-up size decisions , 2008 .

[27]  Franco Caron,et al.  Multi-criteria assessment of the probability of winning in the competitive bidding process , 2001 .

[28]  William R. Park Construction bidding for profit , 1979 .

[29]  Ahmed Senouci,et al.  Use of Genetic Algorithms in Resource Scheduling of Construction Projects , 2004 .

[30]  Ossama Hosny,et al.  Simulating the winning bid: A generalized approach for optimum markup estimation , 2012 .