Quality Management in the Design and Construction Phase: A Case Study
暂无分享,去创建一个
[1] Paulson. DESIGNING TO REDUCE CONSTRUCTION COSTS , 1976 .
[2] Hamzah Abdul-Rahman,et al. Capturing the cost of non‐conformance on construction sites , 1996 .
[3] A. Sohal,et al. Capturing rework costs in projects , 2003 .
[4] David. Proverbs,et al. The performance of contractors in Japan, the UK and the USA , 2002 .
[5] Neil N. Eldin. Management of Engineering/Design Phase , 1991 .
[6] Raykun R. Tan,et al. On the quality of construction engineering design projects , 1995 .
[7] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[8] D A Vlatas. Owner and contractor review to reduce claims , 1986 .
[9] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[10] John F. McGeorge. DESIGN PRODUCTIVITY: A QUALITY PROBLEM , 1988 .
[11] Salman Azhar,et al. Quality Assurance and Control in the Construction of Infrastructure Services in Developing Countries - A Case Study of Pakistan , 2008 .
[12] Chi Ming Tam,et al. Performance assessment scoring system of public housing construction for quality improvement in Hong Kong , 2000 .