Lean Thinking for Structural Engineers

The positive transformation realised from lean concept application in the manufacturing industry has inspired many researchers to investigate and propose its adoption in Architecture, Engineering and Construction industry (AEC). The lean application in construction sector has received significant attention. Building up on previous recommendations regarding lean design and construction, this study explored lean thinking for Structural Engineers (SE) to identify new, efficient and innovative ways for executing structural designs and engineering works. The research study was based on qualitative research method using Systematic Literature Review (SLR). An overview of research works on lean applied to designs demonstrated lean to be a multi-dimensional concept characterised by different levels and therefore defied a universal definition. This paper therefore focused on the first part of the study where an understanding of lean was gained with respect to structural designs and was characterised with lean principles, techniques, processes, practices and tools to deliver value for customers.

[1]  Charles R. Standridge,et al.  A simulation-enhanced lean design process , 2009 .

[2]  Leidian Aragão Torres,et al.  Value Stream Mapping of the Design Process in a Design-Build Firm , 2018 .

[3]  S. L. Da Silva Vieira Crucial Actions in Design, Coping with critical situations: Taking a Lean Thinking perspective , 2013 .

[4]  D. V. Steward,et al.  The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.

[5]  Lauri Koskela,et al.  On the Agenda of Design Management Research , 1998 .

[6]  Michail Kagioglou,et al.  Lean Design Management in a Major Infrastructure Project in UK , 2019 .

[7]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[8]  Computer Staff,et al.  The Machine That Changed the World , 1992 .

[9]  Jim Suhr,et al.  The Choosing By Advantages Decisionmaking System , 1999 .

[10]  Baris Lostuvali,et al.  Lean Product Development at Cathedral Hill Hospital Project , 2012 .

[11]  Lauri Koskela,et al.  Towards Lean Design Management , 1997 .

[12]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[13]  Stephen Emmitt,et al.  Investigating the integration of design and construction from a “lean” perspective , 2009 .

[14]  Luiz Antonio Gargione Using Quality Function Deployment (Qfd) in the Design Phase of an Apartment Construction Project , 1999 .

[15]  U. Vimal Kumar,et al.  A Critical Study of Various Lean Techniques in Practice and Developing a Framework for Different Construction Building Projects , 2016 .

[16]  Anders Bjornfot An Engineering Perspective on Lean Construction Theory , 2008 .

[17]  Jeffrey K. Liker,et al.  The Toyota Product Development System: Integrating People, Process And Technology , 2006 .

[18]  Jens Ove Riis,et al.  Lean Project Management , 1993 .

[19]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[20]  Thomas Olofsson,et al.  Product development through lean design and modularization principles , 2009 .

[21]  Glenn Ballard,et al.  The Lean Project Delivery System: An Update , 2008 .

[22]  Iris D. Tommelein,et al.  Is the Last Planner System Applicable to Design? A Case Study , 2009 .

[23]  D. Tranfield,et al.  Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .

[24]  Glenn Ballard,et al.  Positive Vs. Negative Iteration in Design , 2000 .

[25]  Alan Mossman,et al.  Creating value: a sufficient way to eliminate waste in lean design and lean production , 2009 .

[26]  Christine Pasquire,et al.  Lean Project Delivery — innovation in integrated design & delivery , 2013 .

[27]  Iris D. Tommelein,et al.  Exploration of Set-Based Design for Reinforced Concrete Structures , 2007 .

[28]  Luis F. Alarcón,et al.  Achieving Lean Design Process: Improvement Methodology , 2002 .

[29]  Ben J. Hicks,et al.  Lean information management: Understanding and eliminating waste , 2007, Int. J. Inf. Manag..

[30]  Jonathan Morris,et al.  Improving construction design : the lean thinking paradigm , 1999 .

[31]  Robert S Miles,et al.  Alliance Lean Design/Construct on a Small High Tech Project , 1998 .

[32]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[33]  Torgeir Welo,et al.  Beyond Waste Elimination: Assessing Lean Practices in Product Development , 2016 .

[34]  Iris D. Tommelein,et al.  Deciding a Sustainable Alternative by Choosing by Advantages' in the AEC industry , 2012 .

[35]  Stephen Emmitt,et al.  Implementing Value Through Lean Design Management , 2004 .

[36]  Bhargav Dave,et al.  Case study on design management: Inefficiencies and possible remedies , 2015 .

[37]  Sanjay Bhasin,et al.  Lean viewed as a philosophy , 2006 .

[38]  Christine Pasquire,et al.  VALUE IN CONSTRUCTION FROM A LEAN THINKING PERSPECTIVE : CURRENT STATE AND FUTURE DEVELOPMENT , 2009 .

[39]  Mohamed Marzouk,et al.  APPLICATION OF LEAN PRINCIPLES TO DESIGN PROCESSES IN CONSTRUCTION CONSULTANCY FIRMS , 2011 .

[40]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[41]  Carlos T. Formoso,et al.  Considerations on Application of Lean Construction Principles to Design Management , 1999 .

[42]  Anthony D. Songer,et al.  Design-Led Lean , 2000 .

[43]  Julie Sisson,et al.  A Framework for the Development of a Model for Successful, Sustained Lean Implementation and Improvement , 2014 .

[44]  Carlos T. Formoso,et al.  Developing a Protocol for Managing the Design Process in the Building Industry , 1998 .

[45]  Ossama Salem,et al.  Lean Techniques in the Management of the Design of an Industrial Project , 2012 .

[46]  Jeong-dong Lee,et al.  Measuring the Role of Technology-Push and Demand-Pull in the Dynamic Development of Semiconductor Industry: The Case of the Global DRAM Market , 2007 .

[47]  D. Tranfield,et al.  Producing a systematic review. , 2009 .

[48]  Stephen Emmitt Lean Design Management , 2011 .

[49]  Iris D. Tommelein,et al.  Lean Design Management in an Infrastructure Design-Build Project: A Case Study , 2010 .

[50]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[51]  Finland,et al.  Fast or concurrent: The art of getting construction improved , 1997 .

[52]  Kenneth G. Kreafle Lean Product Development , 2011 .

[53]  Chien-Ho Ko,et al.  Lean Design Process , 2014 .

[54]  Badr Haque,et al.  Applying lean thinking to new product introduction , 2004 .

[55]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[56]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .