Lean Thinking for Structural Engineers
暂无分享,去创建一个
[1] Charles R. Standridge,et al. A simulation-enhanced lean design process , 2009 .
[2] Leidian Aragão Torres,et al. Value Stream Mapping of the Design Process in a Design-Build Firm , 2018 .
[3] S. L. Da Silva Vieira. Crucial Actions in Design, Coping with critical situations: Taking a Lean Thinking perspective , 2013 .
[4] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.
[5] Lauri Koskela,et al. On the Agenda of Design Management Research , 1998 .
[6] Michail Kagioglou,et al. Lean Design Management in a Major Infrastructure Project in UK , 2019 .
[7] Luis F. Alarcón,et al. Assessing the Impacts of Implementing Lean Construction , 2008 .
[8] Computer Staff,et al. The Machine That Changed the World , 1992 .
[9] Jim Suhr,et al. The Choosing By Advantages Decisionmaking System , 1999 .
[10] Baris Lostuvali,et al. Lean Product Development at Cathedral Hill Hospital Project , 2012 .
[11] Lauri Koskela,et al. Towards Lean Design Management , 1997 .
[12] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[13] Stephen Emmitt,et al. Investigating the integration of design and construction from a “lean” perspective , 2009 .
[14] Luiz Antonio Gargione. Using Quality Function Deployment (Qfd) in the Design Phase of an Apartment Construction Project , 1999 .
[15] U. Vimal Kumar,et al. A Critical Study of Various Lean Techniques in Practice and Developing a Framework for Different Construction Building Projects , 2016 .
[16] Anders Bjornfot. An Engineering Perspective on Lean Construction Theory , 2008 .
[17] Jeffrey K. Liker,et al. The Toyota Product Development System: Integrating People, Process And Technology , 2006 .
[18] Jens Ove Riis,et al. Lean Project Management , 1993 .
[19] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[20] Thomas Olofsson,et al. Product development through lean design and modularization principles , 2009 .
[21] Glenn Ballard,et al. The Lean Project Delivery System: An Update , 2008 .
[22] Iris D. Tommelein,et al. Is the Last Planner System Applicable to Design? A Case Study , 2009 .
[23] D. Tranfield,et al. Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review , 2003 .
[24] Glenn Ballard,et al. Positive Vs. Negative Iteration in Design , 2000 .
[25] Alan Mossman,et al. Creating value: a sufficient way to eliminate waste in lean design and lean production , 2009 .
[26] Christine Pasquire,et al. Lean Project Delivery — innovation in integrated design & delivery , 2013 .
[27] Iris D. Tommelein,et al. Exploration of Set-Based Design for Reinforced Concrete Structures , 2007 .
[28] Luis F. Alarcón,et al. Achieving Lean Design Process: Improvement Methodology , 2002 .
[29] Ben J. Hicks,et al. Lean information management: Understanding and eliminating waste , 2007, Int. J. Inf. Manag..
[30] Jonathan Morris,et al. Improving construction design : the lean thinking paradigm , 1999 .
[31] Robert S Miles,et al. Alliance Lean Design/Construct on a Small High Tech Project , 1998 .
[32] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[33] Torgeir Welo,et al. Beyond Waste Elimination: Assessing Lean Practices in Product Development , 2016 .
[34] Iris D. Tommelein,et al. Deciding a Sustainable Alternative by Choosing by Advantages' in the AEC industry , 2012 .
[35] Stephen Emmitt,et al. Implementing Value Through Lean Design Management , 2004 .
[36] Bhargav Dave,et al. Case study on design management: Inefficiencies and possible remedies , 2015 .
[37] Sanjay Bhasin,et al. Lean viewed as a philosophy , 2006 .
[38] Christine Pasquire,et al. VALUE IN CONSTRUCTION FROM A LEAN THINKING PERSPECTIVE : CURRENT STATE AND FUTURE DEVELOPMENT , 2009 .
[39] Mohamed Marzouk,et al. APPLICATION OF LEAN PRINCIPLES TO DESIGN PROCESSES IN CONSTRUCTION CONSULTANCY FIRMS , 2011 .
[40] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[41] Carlos T. Formoso,et al. Considerations on Application of Lean Construction Principles to Design Management , 1999 .
[42] Anthony D. Songer,et al. Design-Led Lean , 2000 .
[43] Julie Sisson,et al. A Framework for the Development of a Model for Successful, Sustained Lean Implementation and Improvement , 2014 .
[44] Carlos T. Formoso,et al. Developing a Protocol for Managing the Design Process in the Building Industry , 1998 .
[45] Ossama Salem,et al. Lean Techniques in the Management of the Design of an Industrial Project , 2012 .
[46] Jeong-dong Lee,et al. Measuring the Role of Technology-Push and Demand-Pull in the Dynamic Development of Semiconductor Industry: The Case of the Global DRAM Market , 2007 .
[47] D. Tranfield,et al. Producing a systematic review. , 2009 .
[48] Stephen Emmitt. Lean Design Management , 2011 .
[49] Iris D. Tommelein,et al. Lean Design Management in an Infrastructure Design-Build Project: A Case Study , 2010 .
[50] Rachna Shah,et al. Defining and developing measures of lean production , 2007 .
[51] Finland,et al. Fast or concurrent: The art of getting construction improved , 1997 .
[52] Kenneth G. Kreafle. Lean Product Development , 2011 .
[53] Chien-Ho Ko,et al. Lean Design Process , 2014 .
[54] Badr Haque,et al. Applying lean thinking to new product introduction , 2004 .
[55] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[56] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .