The investment model in preventive maintenance in multi-level production systems

In this research, cost/benefit models for investments made in quality improvements are developed to measure the impact of quality programs and to predict the return of an investment in these programs in a multi-level assembly system. Using these models, the decision makers can decide whether and how much to invest in quality improvement projects. The relationship between the investment and return on investment can be developed based on the tangible variables. The investment model in preventive maintenance is developed in a multi-level assembly system. The investment in preventive maintenance is to reduce the variance and the deviation of the mean from the target value of the quality characteristic, and hence to reduce the proportion of defectives and also to increase reliability. The proportion of defectives can be linked to manufacturing cost, inventory cost, and profit loss. The reliability is linked to warranty cost. The total costs in this investment model include manufacturing cost, setup cost, holding cost, profit loss, and warranty cost.

[1]  S. Goyal,et al.  An imperfect production process in a volume flexible inventory model , 2007 .

[2]  Jae-Dong Hong,et al.  Process quality improvement and setup reduction in dynamic lot-sizing , 1993 .

[3]  When-Hsien Chen THE EFFECTS OF SPC ON THE TARGET OF PROCESS QUALITY IMPROVEMENT , 1996 .

[4]  S. Papachristos,et al.  Economic ordering quantity models for items with imperfect quality , 2006 .

[5]  M. Ben-Daya,et al.  Multi-stage lot sizing models with imperfect processes and inspection errors , 1999 .

[6]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[7]  Evan L. Porteus Investing in new parameter values in the discounted EOQ model , 1986 .

[8]  Suresh Kumar Goyal,et al.  On lot streaming in multistage production systems , 2005 .

[9]  J. M. Groocock,et al.  The cost of quality , 1974 .

[10]  Angappa Gunasekaran,et al.  Optimal investment and lot-sizing policies for improved productivity and quality , 1995 .

[11]  Hsu–Hua Lee Investment model development for repetitive inspections and measurement equipment in imperfect production systems , 2006 .

[12]  Stanley B. Davis,et al.  Quality Management , 2005 .

[13]  Jae-Dong Hong Optimal production cycles, procurement schedules, and joint investment in an imperfect production system , 1997, Eur. J. Oper. Res..

[14]  Hsu-Hua Lee,et al.  A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system , 2005, Comput. Ind. Eng..

[15]  G. Ozdemir,et al.  An economic order quantity model with defective items and shortages , 2007 .

[16]  Jack C. Hayya,et al.  Joint investment in quality improvement and setup reduction , 1995, Comput. Oper. Res..

[17]  J. Trevino,et al.  A mathematical model for the economic justification of setup time reduction , 1993 .

[18]  M. Chandra,et al.  OPTIMAL BATCH SIZE AND INVESTMENT IN MULTISTAGE PRODUCTION SYSTEMS WITH SCRAP , 1997 .

[19]  Hark Hwang,et al.  Multiproduct economic lot size models with investment costs for setup reduction and quality improvement , 1993 .

[20]  Angappa Gunasekaran,et al.  Effect of Dynamic Process Quality Control on the Economics of Production , 1990 .

[21]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[22]  Elliott N. Weiss,et al.  The multi-item setup-reduction investment-allocation problem with continuous investment-cost functions , 1997 .

[23]  Dimitri Kececioglu,et al.  Reliability engineering handbook , 1991 .

[24]  Fred A. Spiring,et al.  A New Measure of Process Capability: Cpm , 1988 .

[25]  P. O'Connor,et al.  Practical Reliability Engineering , 1981 .

[26]  Romulo I. Zequeira,et al.  Optimal buffer inventory and preventive maintenance for an imperfect production process , 2004 .

[27]  Shey-Huei Sheu,et al.  Optimal lot-sizing problem with imperfect maintenance and imperfect production , 2004, Int. J. Syst. Sci..

[28]  I. Djamaludin,et al.  Quality control through lot sizing for items sold with warranty , 1994 .

[29]  Philip E. Gill,et al.  Practical optimization , 1981 .