Project schedule risk management through building information modelling
暂无分享,去创建一个
Muhammad Jamaluddin Thaheem | Abdur Rehman Nasir | Khurram Iqbal Ahmad Khan | Muhammad Sami Ur Rehman
[1] Chengshuang Sun,et al. Study on BIM-based construction project cost and schedule risk early warning , 2015, J. Intell. Fuzzy Syst..
[2] Miroslaw J. Skibniewski,et al. Bim-Based Risk Identification System in tunnel construction , 2016 .
[3] A. Nadeem,et al. Delay causes in Kazakhstan’s construction projects and remedial measures , 2019, International Journal of Construction Management.
[4] Raja R. A. Issa,et al. Building Information Modeling in Support of Sustainable Design and Construction , 2013 .
[5] Martin Fischer,et al. Visual-Based Scheduling: 4D Modeling on the San Mateo County Health Center , 1996 .
[6] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[7] Muhammad Jamaluddin Thaheem,et al. Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty , 2018, Automation in Construction.
[8] Muhammad Jamaluddin Thaheem,et al. Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects , 2019, Journal of Construction Engineering and Management.
[9] Hesham A. Bassioni,et al. Causes of Delay in Building Construction Projects in Egypt , 2008 .
[10] Yong Kwon Cho,et al. Construction-specific spatial information reasoning in Building Information Models , 2015, Adv. Eng. Informatics.
[11] Alan D. Russell,et al. Automated schedule generation , 1998 .
[12] Long Le-Hoai,et al. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .
[13] Amund Bruland,et al. Causes of Delay in Road Construction Projects , 2012 .
[14] Salman Azhar,et al. Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .
[15] Wei-Chih Wang,et al. Integrating building information models with construction process simulations for project scheduling support , 2014 .
[16] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[17] Muhammad Jamaluddin Thaheem,et al. Developing a residential building-related social sustainability assessment framework and its implications for BIM , 2017 .
[18] Ahmet Öztaş,et al. Construction Project Network Evaluation With Correlated Schedule Risk Analysis Model , 2008 .
[19] Ray Y. Zhong,et al. Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction , 2017 .
[20] Abang Abdullah Abang Ali,et al. Factors affecting construction labour productivity for Malaysian residential projects , 2005 .
[21] James Mitchell,et al. Intelligent Sustainable Design: Integration of Carbon Accounting and Building Information Modeling , 2011 .
[22] Rogier Jongeling,et al. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .
[23] N. Kartam,et al. Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .
[24] Mingming Hu,et al. Building-information-modeling enabled life cycle assessment, a case study on carbon footprint accounting for a residential building in China , 2018 .
[25] David K. H. Chua,et al. Overlapping design and construction activities and an optimization approach to minimize rework , 2014 .
[26] Bon-Gang Hwang,et al. Identifying the critical factors affecting schedule performance of public housing projects , 2013 .
[27] Ayman Abu Hammad,et al. Delays in construction projects: The case of Jordan , 2008 .
[28] Muhammad Jamaluddin Thaheem,et al. Exploring the role of building information modeling in construction safety through science mapping , 2019 .
[29] Petr Matějka,et al. The Impact of BIM on Risk Management as an Argument for its Implementation in a Construction Company , 2014 .
[30] Qing Fan,et al. Building information modelling (BIM) for sustainable building design , 2013 .
[31] Ali Jaafari. Criticism of CPM for Project Planning Analysis , 1984 .
[32] A. M. Odeh,et al. Causes of construction delay: traditional contracts , 2002 .
[33] Chung-Wei Feng,et al. Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .
[34] O. Ditlevsen. Narrow Reliability Bounds for Structural Systems , 1979 .
[35] Sameh M. El-Sayegh,et al. Significant factors causing delay in the UAE construction industry , 2006 .
[36] Margaret Emsley,et al. The impact of contractors' attributes on construction project success: A post construction evaluation , 2013 .
[37] Jian-Ping Zhang,et al. Application of 4D for dynamic site layout and management of construction projects , 2005 .
[38] Charles M. Eastman,et al. Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .
[39] Julio C. Martinez,et al. Visualizing Simulated Construction Operations in 3D , 2001 .
[40] Nashwan Dawood,et al. DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .
[41] Kerry London,et al. Understanding and facilitating BIM adoption in the AEC industry , 2010 .
[42] Ronald McCaffer,et al. FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .
[43] David Bryde,et al. The project benefits of Building Information Modelling (BIM) , 2013 .
[44] Kumar Neeraj Jha,et al. Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .
[45] Ajibade A. Aibinu,et al. Construction delays and their causative factors in Nigeria , 2006 .
[46] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[47] Frederick E. Gould. Managing the Construction Process: Estimating, Scheduling, and Project Control , 1996 .
[48] Kwok-wing Chau,et al. Four-dimensional visualization of construction scheduling and site utilization , 2004 .
[49] Meng Li,et al. An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM , 2018, Automation in Construction.
[50] Fabian C. Hadipriono,et al. Nondeterministic Networking Methods , 1993 .
[51] Timo Hartmann,et al. Aligning building information model tools and construction management methods , 2012 .
[52] Ernawati,et al. The significant factors causing delay of building construction projects in Malaysia , 2007 .
[53] Muhammad Jamaluddin Thaheem,et al. Economic sustainability assessment of residential buildings: A dedicated assessment framework and implications for BIM , 2018 .
[54] Gürsel A. Süer,et al. Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method , 2009 .
[55] Tommy Y. Lo,et al. Construction Delays in Hong Kong Civil Engineering Projects , 2006 .
[56] Jun Wang,et al. Geotechnical and safety protective equipment planning using range point cloud data and rule checking in building information modeling , 2015 .
[57] Robert Owen,et al. Interaction of Lean and Building Information Modeling in Construction , 2010 .
[58] Brenda McCabe,et al. Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model , 2003 .
[59] Mohan M. Kumaraswamy,et al. Compressing construction durations: lessons learned from Hong Kong building projects , 2002 .
[60] G. Heravi,et al. Investigating cost overruns and delay in urban construction projects in Iran , 2019, International Journal of Construction Management.
[61] Saheed O. Ajayi,et al. Impacts of 4D BIM on construction project performance , 2019, International Journal of Construction Management.
[62] Mohan M. Kumaraswamy,et al. Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .
[63] Mohan M. Kumaraswamy,et al. A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .
[64] Albert P.C. Chan,et al. Factors Affecting the Success of a Construction Project , 2004 .
[65] Stephen O. Ogunlana,et al. Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .
[66] Steve Rowlinson,et al. 4DCAD‐Safety: visualizing project scheduling and safety planning , 2005 .
[67] Kenneth T. Sullivan,et al. How To Measure the Benefits of BIM - A Case Study Approach , 2012 .
[68] Arto Kiviniemi,et al. A review of risk management through BIM and BIM-related technologies , 2017 .