Project schedule risk management through building information modelling

The complex and dynamic nature of construction projects, due to intricate design and involvement of several direct and indirect stakeholders, exposes them to various risks. These risks may cause co...

[1]  Chengshuang Sun,et al.  Study on BIM-based construction project cost and schedule risk early warning , 2015, J. Intell. Fuzzy Syst..

[2]  Miroslaw J. Skibniewski,et al.  Bim-Based Risk Identification System in tunnel construction , 2016 .

[3]  A. Nadeem,et al.  Delay causes in Kazakhstan’s construction projects and remedial measures , 2019, International Journal of Construction Management.

[4]  Raja R. A. Issa,et al.  Building Information Modeling in Support of Sustainable Design and Construction , 2013 .

[5]  Martin Fischer,et al.  Visual-Based Scheduling: 4D Modeling on the San Mateo County Health Center , 1996 .

[6]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[7]  Muhammad Jamaluddin Thaheem,et al.  Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty , 2018, Automation in Construction.

[8]  Muhammad Jamaluddin Thaheem,et al.  Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects , 2019, Journal of Construction Engineering and Management.

[9]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[10]  Yong Kwon Cho,et al.  Construction-specific spatial information reasoning in Building Information Models , 2015, Adv. Eng. Informatics.

[11]  Alan D. Russell,et al.  Automated schedule generation , 1998 .

[12]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[13]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[14]  Salman Azhar,et al.  Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry , 2011 .

[15]  Wei-Chih Wang,et al.  Integrating building information models with construction process simulations for project scheduling support , 2014 .

[16]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[17]  Muhammad Jamaluddin Thaheem,et al.  Developing a residential building-related social sustainability assessment framework and its implications for BIM , 2017 .

[18]  Ahmet Öztaş,et al.  Construction Project Network Evaluation With Correlated Schedule Risk Analysis Model , 2008 .

[19]  Ray Y. Zhong,et al.  Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction , 2017 .

[20]  Abang Abdullah Abang Ali,et al.  Factors affecting construction labour productivity for Malaysian residential projects , 2005 .

[21]  James Mitchell,et al.  Intelligent Sustainable Design: Integration of Carbon Accounting and Building Information Modeling , 2011 .

[22]  Rogier Jongeling,et al.  A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .

[23]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[24]  Mingming Hu,et al.  Building-information-modeling enabled life cycle assessment, a case study on carbon footprint accounting for a residential building in China , 2018 .

[25]  David K. H. Chua,et al.  Overlapping design and construction activities and an optimization approach to minimize rework , 2014 .

[26]  Bon-Gang Hwang,et al.  Identifying the critical factors affecting schedule performance of public housing projects , 2013 .

[27]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[28]  Muhammad Jamaluddin Thaheem,et al.  Exploring the role of building information modeling in construction safety through science mapping , 2019 .

[29]  Petr Matějka,et al.  The Impact of BIM on Risk Management as an Argument for its Implementation in a Construction Company , 2014 .

[30]  Qing Fan,et al.  Building information modelling (BIM) for sustainable building design , 2013 .

[31]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[32]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[33]  Chung-Wei Feng,et al.  Using the MD CAD model to develop the time–cost integrated schedule for construction projects , 2010 .

[34]  O. Ditlevsen Narrow Reliability Bounds for Structural Systems , 1979 .

[35]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[36]  Margaret Emsley,et al.  The impact of contractors' attributes on construction project success: A post construction evaluation , 2013 .

[37]  Jian-Ping Zhang,et al.  Application of 4D for dynamic site layout and management of construction projects , 2005 .

[38]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[39]  Julio C. Martinez,et al.  Visualizing Simulated Construction Operations in 3D , 2001 .

[40]  Nashwan Dawood,et al.  DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .

[41]  Kerry London,et al.  Understanding and facilitating BIM adoption in the AEC industry , 2010 .

[42]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .

[43]  David Bryde,et al.  The project benefits of Building Information Modelling (BIM) , 2013 .

[44]  Kumar Neeraj Jha,et al.  Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .

[45]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[46]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[47]  Frederick E. Gould Managing the Construction Process: Estimating, Scheduling, and Project Control , 1996 .

[48]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[49]  Meng Li,et al.  An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIM , 2018, Automation in Construction.

[50]  Fabian C. Hadipriono,et al.  Nondeterministic Networking Methods , 1993 .

[51]  Timo Hartmann,et al.  Aligning building information model tools and construction management methods , 2012 .

[52]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[53]  Muhammad Jamaluddin Thaheem,et al.  Economic sustainability assessment of residential buildings: A dedicated assessment framework and implications for BIM , 2018 .

[54]  Gürsel A. Süer,et al.  Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method , 2009 .

[55]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[56]  Jun Wang,et al.  Geotechnical and safety protective equipment planning using range point cloud data and rule checking in building information modeling , 2015 .

[57]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[58]  Brenda McCabe,et al.  Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model , 2003 .

[59]  Mohan M. Kumaraswamy,et al.  Compressing construction durations: lessons learned from Hong Kong building projects , 2002 .

[60]  G. Heravi,et al.  Investigating cost overruns and delay in urban construction projects in Iran , 2019, International Journal of Construction Management.

[61]  Saheed O. Ajayi,et al.  Impacts of 4D BIM on construction project performance , 2019, International Journal of Construction Management.

[62]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[63]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[64]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[65]  Stephen O. Ogunlana,et al.  Quantifying schedule risk in construction projects using Bayesian belief networks , 2009 .

[66]  Steve Rowlinson,et al.  4DCAD‐Safety: visualizing project scheduling and safety planning , 2005 .

[67]  Kenneth T. Sullivan,et al.  How To Measure the Benefits of BIM - A Case Study Approach , 2012 .

[68]  Arto Kiviniemi,et al.  A review of risk management through BIM and BIM-related technologies , 2017 .