Ablaufplanung für die Leitstrukturoptimierung in der Pharmaforschung
暂无分享,去创建一个
Rainer Kolisch | Konrad Meyer | Roland Mohr | Christoph Schwindt | M. Urmann | R. Kolisch | K. Meyer | R. Mohr | Christoph Schwindt | M. Urmann
[1] Rainer Kolisch,et al. Make-To-Order Assembly Management , 2000 .
[2] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.
[3] Arno Sprecher,et al. Neue Entwicklungen in der Projektplanung , 1997 .
[4] Rainer Kolisch,et al. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem , 1995 .
[5] Robert Klein,et al. Scheduling of Resource-Constrained Projects , 1999 .
[6] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[7] Rainer Völker. Planung und Steuerung von Entwicklungsprojekten in der Pharmabranche , 2001 .
[8] Rolf H. Möhring,et al. Solving Project Scheduling Problems by Minimum Cut Computations , 2002, Manag. Sci..
[9] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[10] Subhash C. Narula,et al. Multi-Project Scheduling: Analysis of Project Performance , 1985 .
[11] K. Brockhoff. Forschung und Entwicklung : Planung und Kontrolle , 1999 .
[12] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[13] Wolfgang Domschke,et al. Einführung in Operations Research , 1990 .
[14] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[15] Hans J. Laue,et al. Efficient methods for the allocation of resources in project networks , 1968, Unternehmensforschung.
[16] Yadati Narahari,et al. Queueing network modelling and lead time compression of pharmaceutical drug development , 2001 .
[17] Rolf H. Möhring,et al. Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..
[18] Edgar C. Lange,et al. Abbruchentscheidung bei F&E-Projekten , 1993 .