PRECISE MEASUREMENT OF SUPERCONDUCTING CAVITY MOVEMENT IN CRYOMODULE BY THE POSITION MONITOR USING WHITE LIGHT INTERFEROMETER
暂无分享,去创建一个
Masaru Sawamura | Kazuhiro Enami | Takaaki Furuya | Enrico Cenni | Masato Satoh | Kenji Shinoe | K. Umemori | H. Sakai | Tomohiro Aoto | Tsutomu Kanzaki
[1] Masaru Sawamura,et al. COOLING PROPERTIES OF HOM ABSORBER MODEL FOR CERL IN JAPAN , 2011 .
[2] S. Sakanaka,et al. DESIGN OF L-BAND SUPERCONDUCTING CAVITY FOR THE ENERGY RECOVERY LINACS , 2007 .
[3] C. Pagani,et al. A wire position monitor (wpm) system to control the cold mass movements inside the TTF Cryomodule , 1997, Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167).
[4] Hirotaka Nakai,et al. PROGRESS IN CONSTRUCTION OF THE 35-MEV COMPACT ENERGY RECOVERY LINAC AT KEK , 2013 .
[5] Masaru Sawamura,et al. HIGH POWER TESTS OF KEK-ERL INPUT COUPLER FOR MAIN LINAC UNDER LIQUID NITROGEN CONDITION , 2011 .
[6] Kazuhiro Enami,et al. HIGH POWER CW TESTS OF cERL MAIN-LINAC CRYOMODULE , 2013 .
[7] Kazuhiro Enami,et al. STATUS OF MAIN LINAC CRYOMODULE DEVELOPMENT FOR COMPACT ERL PROJECT , 2012 .
[8] Takaaki Furuya,et al. VERTICAL TEST RESULTS FOR ERL 9-CELL CAVITIES FOR COMPACT ERL PROJECT , 2012 .