Disaggregate Model to Forecast Transformer Usage

The purpose of this work is to create a tool that can be used to forecast monthly transformer usage for a large investor-owned electric and gas utility based in St. Louis, Missouri, USA. The company works to ensure reliable, low-cost service to all of its customers by continuously improving its systems. In order to ensure efficient operation of the company into the future, it is important that the correct items be provided in the correct locations whenever they are required. Transformers are one of the key items that the company must have to provide continuous supply of power to its customers, thereby maintaining overall customer satisfaction. Hence, the ability to properly forecast the usage of transformer is very important. The use of forecasting models during inventory planning is a widely accepted, yet critical, practice in a variety of industries (Sanders and Manrodt, 1994). Among various forecasting models, appropriate forms of exponential smoothing are often recommended due to their relatively good performance (Chatfield and Yar, 1988; Gardner 2006). However, these traditional models do not perform well when historical data are not sufficient to predict future usage levels. The transformer usage data from the company reveal that trends in usage levels could quickly change before any backward-looking forecasting model could adapt. We also observe that the traditional forecasts at the aggregate level are unsatisfactory because several unrelated causes of transformer usage are not considered. This leads to the identification of the various causes of transformer usage and the development of a specialized disaggregate model. Although it is recognized that disaggregation generally increases variance, this is alleviated due to the benefits of more accurate disaggregate forecasts, which exploit the characteristics that are specific to each disaggregate segment. Weatherford et al. (2001) has shown that it is essential to forecast disaggregate segments within the data when they are known to have significantly unique usage patterns. This disaggregation concept is applied to forecast the company’s monthly transformer usage for the coming year. Our disaggregate forecasting model recognizes three distinct segments with notably unique causes of transformer usage such as new construction (NC), storm and emergency (SE), and general maintenance (GM). Of these three, new construction is of particular interest due to its dependence on outside factors. We develop a new forecasting model for the NC portion of the data, incorporating a forward-looking trend variable that is exogenously determined. The benefits of creating disaggregate, demand-pattern-specific forecasting models are further realized for both the SE and GM portions of the data. SE usage is volatile by nature, so a model that can smooth this tendency better is selected. The final disaggregate segment, GM, shows a stable demand pattern with a gradual change in trend that occurred over a long period of time. For this reason, an exponential smoothing model is a good forecasting technique for this Matthew Roman University of Missouri, USA

[1]  Cengiz Kahraman,et al.  A decision support system for demand forecasting with artificial neural networks and neuro-fuzzy models: A comparative analysis , 2009, Expert Syst. Appl..

[2]  Derek W. Bunn,et al.  Comparison of seasonal estimation methods in multi-item short-term forecasting , 1999 .

[3]  Manuel Filipe Santos,et al.  Closing the Gap between Data Mining and Business Users of Business Intelligence Systems: A Design Science Approach , 2012, Int. J. Bus. Intell. Res..

[4]  Liljana Ferbar,et al.  Demand forecasting methods in a supply chain: Smoothing and denoising , 2009 .

[5]  M. Xia,et al.  Adaptive neural network model for time-series forecasting , 2010, Eur. J. Oper. Res..

[6]  Lee-Ing Tong,et al.  Forecasting time series using a methodology based on autoregressive integrated moving average and genetic programming , 2011, Knowl. Based Syst..

[7]  Robert Fildes,et al.  One day ahead demand forecasting in the utility industries: Two case studies , 1997 .

[8]  Brian J. Cerruti A Statistical Forecast Model of Weather-Related Damage to a Major Electric Utility , 2011 .

[9]  E. S. Gardner EXPONENTIAL SMOOTHING: THE STATE OF THE ART, PART II , 2006 .

[10]  Xiaodong Li,et al.  Time series forecasting by evolving artificial neural networks with genetic algorithms, differential evolution and estimation of distribution algorithm , 2011, Neural Computing and Applications.

[11]  Robert Fildes,et al.  The evaluation of extrapolative forecasting methods , 1992 .

[12]  Sven F. Crone,et al.  Forecasting and operational research: a review , 2008, J. Oper. Res. Soc..

[13]  Robert Fildes,et al.  Against Your Better Judgment? How Organizations Can Improve Their Use of Management Judgment in Forecasting , 2007, Interfaces.

[14]  P. S. Dharmapala,et al.  Randomizing Efficiency Scores in DEA Using Beta Distribution: An Alternative View of Stochastic DEA and Fuzzy DEA , 2014 .

[15]  Giulio Zotteri,et al.  The impact of aggregation level on forecasting performance , 2005 .

[16]  Stephen M. Disney,et al.  Forecasting for inventory planning: a 50-year review , 2009, J. Oper. Res. Soc..

[17]  Sébastien Thomassey,et al.  Sales forecasts in clothing industry: The key success factor of the supply chain management , 2010 .

[18]  John Wang,et al.  Encyclopedia of Business Analytics and Optimization , 2018 .

[19]  Oscar Tamburis,et al.  A Mathematical Model to Plan the Adoption of EHR Systems , 2014 .

[20]  Ulrike Leopold-Wildburger,et al.  Experiments on forecasting behavior with several sources of information - A review of the literature , 2011, Eur. J. Oper. Res..

[21]  Sheryl E. Kimes,et al.  Forecasting for Hotel Revenue Management: Testing Aggregation Against Disaggregation , 2001 .

[22]  Chris Chatfield,et al.  Holt‐Winters Forecasting: Some Practical Issues , 1988 .

[23]  N. Sanders,et al.  Forecasting Practices in US Corporations: Survey Results , 1994 .

[24]  Byron J. Dangerfield,et al.  Top-down or bottom-up: Aggregate versus disaggregate extrapolations , 1992 .

[25]  James W. Taylor,et al.  Multi-item sales forecasting with total and split exponential smoothing , 2011, J. Oper. Res. Soc..

[26]  Fred L. Collopy,et al.  Error Measures for Generalizing About Forecasting Methods: Empirical Comparisons , 1992 .

[27]  Giulio Zotteri,et al.  A model for selecting the appropriate level of aggregation in forecasting processes , 2007 .