Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
暂无分享,去创建一个
[1] Fawaz S. Al-Anzi,et al. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times , 2006 .
[2] Fawaz S. Al-Anzi,et al. A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times , 2007, Eur. J. Oper. Res..
[3] O. V. Krishnaiah Chetty,et al. Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach , 2007 .
[4] Chris N. Potts,et al. The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..
[5] Ivan Zelinka,et al. ON STAGNATION OF THE DIFFERENTIAL EVOLUTION ALGORITHM , 2000 .
[6] Andries Petrus Engelbrecht,et al. Self-adaptive Differential Evolution , 2005, CIS.
[7] Imtiaz Ahmad,et al. Particle swarm optimization for task assignment problem , 2002, Microprocess. Microsystems.
[8] V. Perdomo,et al. Operating Theatre Scheduling Using Lagrangian Relaxation , 2006, 2006 International Conference on Service Systems and Service Management.
[9] Arthur C. Sanderson,et al. Pareto-based multi-objective differential evolution , 2003, The 2003 Congress on Evolutionary Computation, 2003. CEC '03..
[10] P. Lopez,et al. Climbing depth-bounded discrepancy search for solving hybrid flow shop problems , 2007 .
[11] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[12] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[13] Xi Sun,et al. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling , 2003, Eur. J. Oper. Res..
[14] Chung-Yee Lee,et al. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .
[15] Tarek Y. ElMekkawy,et al. Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times , 2007 .
[16] Yeong-Dae Kim,et al. A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops , 1993, Comput. Oper. Res..
[17] Emmanuel Neron,et al. An unrelated parallel machines model for an industrial production resetting problem , 2008 .
[18] Michel Gourgand,et al. Modelling and solving a multimode and multisite industrial problem: Lagrangean relaxation and heuristic approaches , 2008 .
[19] Tarek Y. ElMekkawy,et al. Deadlock-free scheduling of flexible job shops with limited capacity buffers , 2008 .
[20] Godfrey C. Onwubolu,et al. Scheduling flow shops using differential evolution algorithm , 2006, Eur. J. Oper. Res..
[21] Bala Ram,et al. Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups , 2007 .
[22] Fawaz S. Al-Anzi,et al. The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time , 2008 .
[23] Frans van den Bergh,et al. An analysis of particle swarm optimizers , 2002 .
[24] Jorge M. S. Valente. Heuristics for the single machine scheduling problem with early and quadratic tardy penalties , 2007 .
[25] C. Potts,et al. A branch and bound algorithm for the two-stage assembly scheduling problem , 1997 .
[26] B. Babu,et al. Differential evolution for multi-objective optimization , 2003, The 2003 Congress on Evolutionary Computation, 2003. CEC '03..
[27] Fawaz S. Al-Anzi,et al. A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application , 2006, Comput. Oper. Res..
[28] Xiaoyun Xu,et al. Influencing factors of job waiting time variance on a single machine , 2007 .