Critical Review of the Potential for the Implementation of Lean in the Nigerian Building Industry

The concept of Lean Construction has been observed to improve workflow reliability, planning and control, particularly in developed and emerging countries like USA, UK, Korea and Brazil. It has been a useful means of achieving project duration reduction and improved cost and quality performance. Predominantly, the Last Planner systems, process mapping and other collaborative planning tools of lean construction were utilised in these projects and they accounted for the successes of these projects. However, within under developed and a few developing countries the situation is slightly more at variance. Using Nigeria as a case study for example, the general perception at the moment is that the building industry is mainly characterised by poor project definitions, incomplete project designs and waste generation resulting in uncompleted building projects or poorly completed ones. This paper commences with a review of how lean was applied and why it was successful in the countries identified by previous studies. It then progresses to further review what is currently obtainable in the Nigerian building industry. This then led to a process of addressing the applicability of lean tools within the Nigerian building industry. The results from the review reveal the potential for the application of lean tools within the industry. Sequel to this, the author proposes that Last Planner system of lean be implemented via action research within building industry of Nigeria. It is on the basis of this that further research is being proposed to address this concern.

[1]  Sanusi Dantata General overview of the Nigerian construction industry , 2007 .

[2]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[3]  기술전략팀 [기술강좌] Last Planner , 2003 .

[4]  Rafael Sacks,et al.  Lean Management Model for Construction of High-Rise Apartment Buildings , 2007 .

[5]  Stuart D. Green THE HUMAN RESOURCE MANAGEMENT IMPLICATIONS OF LEAN CONSTRUCTION: CRITICAL PERSPECTIVES AND CONCEPTUAL CHASMS , 2002 .

[6]  Stuart D. Green The missing arguments of lean construction , 1999 .

[7]  Lauri Koskela,et al.  Last planner system : experiences from pilot implementation in the middle east , 2009 .

[8]  Gregory A. Howell,et al.  Bringing Light to the Dark Side of Lean Construction: A Response to Stuart Green , 1999 .

[9]  Ossama Salem,et al.  Site Implementation and Assessment of Lean Construction Techniques , 2005 .

[10]  Luqman Oyekunle Oyewobi,et al.  Determinants of Unethical Performance in Nigerian Construction Industry , 2011 .

[11]  Mohamed Al-Hussein,et al.  Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .

[12]  P. Järvinen Action Research is Similar to Design Science , 2007 .

[13]  R. Rapoport Three Dilemmas in Action Research , 1970 .

[14]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[15]  Luis F. Alarcón,et al.  Investigating the relationship between planning reliability and project performance , 2007 .

[16]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[17]  Iris D. Tommelein,et al.  Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .

[18]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[19]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[20]  Glenn Ballard Improving Work Flow Reliability , 1999 .

[21]  Glenn Ballard,et al.  Production Control Principles , 2009 .

[22]  George Ofori,et al.  Contemporary Issues in Construction in Developing Countries , 2012 .

[23]  Joseph Oladiran Olatunji Lean-in- Nigerian Construction: State, Barriers, Strategies and “Go-Togemba” Approach , 2008 .

[24]  Eric Johansen,et al.  An experience of introducing last planner into a UK construction project , 2003 .

[25]  Anil Sawhney,et al.  Cycle-Time Contributions of Hyper-Specialization and Time-Gating Strategies in Us Residential Construction , 2003 .

[26]  Irtishad Ahmad,et al.  Action Research as a Proactive Research Method for Construction Engineering and Management , 2010 .

[27]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[28]  Elijah Olusegun Alabi Olumuyiwa Michael Ayodele,et al.  Abandonment of construction projects in Nigeria : causes and effects , 2011 .

[29]  M. M. Dlakwa,et al.  Reasons for overrun in public sector construction projects in Nigeria , 1990 .

[30]  Iris D. Tommelein,et al.  Parade Game: Impact of Work Flow Variability on Succeeding Trade Performance , 1998 .

[31]  Bo Jørgensen,et al.  Integrating Lean Design and Lean Construction: Processes and methods , 2006 .

[32]  Lauri Koskela,et al.  Contribution of the Principles of Lean Construction to Meet the Challenges of Sustainable Development , 1998 .

[33]  Sven Bertelsen,et al.  BRIDGING THE GAPS - TOWARDS A COMPREHENSIVE UNDERSTANDING OF LEAN CONSTRUCTION , 2002 .

[34]  Stuart D. Green,et al.  Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .

[35]  Luis F. Alarcón,et al.  Improving Planning Reliability and Project Performance using the Reliable Commitment Model. , 2010 .

[36]  Antonio Sergio,et al.  Lean Construction: From Theory to Practice , 2002 .

[37]  Yong-Woo Kim,et al.  Case Study: An Application of Last Planner to Heavy Civil Construction in Korea , 2005 .

[38]  Gregory A. Howell,et al.  Lean project management , 2003 .